To set the foundation of a house with 3 bedrooms, a master room, kitchen, and an ablution block, you would generally follow these steps:

1. Design the house: Determine the layout and dimensions of each room. Take into account the necessary space requirements for each area, such as bedrooms, bathrooms, and kitchen, along with any other specifications or preferences.

2. Determine the foundation type: Depending on the soil conditions and building codes in your area, choose a suitable foundation type. Common options include a concrete slab, crawl space, or basement. Consult with an architect or structural engineer if necessary.

3. Dig the foundation: Prepare the area by clearing any vegetation or debris. Excavate the ground for the foundation, adhering to the dimensions and depth specified in your local building codes.

4. Install footings: Pour concrete footings along the perimeter of the excavated area. The size and depth of the footings will depend on the load-bearing capacity required for the structure.

5. Build foundation walls: Construct the walls of the foundation using materials such as poured concrete, concrete blocks, or insulated concrete forms (ICFs). The walls should follow the design and specifications outlined in the architectural plans.

6. Install plumbing and electrical lines: Before pouring the floor slab, make provisions for plumbing and electrical lines that will serve the kitchen, bathrooms, and other areas. This may involve roughing-in pipes and conduits within the foundation walls or subfloor.

7. Pour the floor slab: Pour a concrete floor slab to create a solid base for the house. Ensure that the slab is level and meets the requirements set by local building codes.

8. Install the ablution block: If the ablution block is a separate structure, follow the same steps for its foundation and construction. Ensure proper plumbing and ventilation for the toilets, sinks, showers, and other fixtures.

9. Construct the walls: After the foundation is complete, proceed with building the walls using the chosen materials, such as bricks, wood frames, or prefabricated panels. Include insulation if needed, and ensure proper openings for doors and windows.

10. Complete the roof: Install the roofing materials according to the desired design, weather conditions, and local building codes. This may involve adding trusses or rafters, sheathing, underlayment, and the final roof covering.

11. Finish the interior: Once the house is weather-tight, work on the interior finishes, such as insulation, drywall installation, flooring, painting, and trim work. Focus on each room, including the bedrooms, master room, kitchen, and ablution block, to complete the desired layout and functionality.

12. Install fixtures and utilities: Connect plumbing fixtures, electrical outlets, lighting fixtures, and other utilities as per the design plans. Ensure compliance with local building codes and safety standards.

13. Landscape and exterior finishing: Finish the exterior of the house by adding siding, stucco, or other chosen materials. Landscape the surroundings, add pathways, fencing, and other exterior features to enhance the property's aesthetics and functionality.

Remember, this is a general outline, and the actual construction process may vary based on local regulations, climate conditions, and individual preferences. It is advisable to consult with professionals, such as architects, engineers, and contractors, to ensure a successful and compliant construction project.