A worker takes a random sample of 200 bolts and finds that 30 of them are either too long or too short, thus making them unusable. Estimate the number of unusable bolts in a production of 17,000 bolts.
1 answer
200 / 30 = 17000 / n
You can
ask a new question
or
answer this question
.
Related Questions
The data from two random samples of 200 people regarding their favorite nuts is shown in the following table.
Almond Pistachio
A factory finds out that on the average 20% of bolts produced by the given machine will be defective.if 10 bolts are selected at
Find the probability that at most 5 defective bolts will be found in a box of 200 bolts if it is known that 2 per cent of such
Angie takes a random sample of 100 students in her school and finds that 58% of the sample prefers art over music. There are
If 5% of the bolts made by an automotive factory are defective , what is the probability that in a shipment of 200 bolts, there
n order to study the amounts owed to the city council, a city clerk takes a random sample of 16 files from a cabinet containing
The number of defects in a random sample of 200 parts produced by a machine is binomially distributed with p = .03. Based on
A factory finds out that on the average 20% of bolts produced by the given machine will be defective.if 10 bolts are selected at
In the mass production of bolts it is found that 5% are defective. Bolts selected at random and put into
packets of ten. A packet
If 1.5% of the bolts made by an automotive factory are defective, what is the probability that in a shipment of 200 bolts, there