Questions LLC
Login
or
Sign Up
Ask a New Question
Science
Physics
A machine has a efficiency of 60% calculate the work done by a person using the machine to raise a load of 120kg through a vertical distance of 3m ( take g is equal to 10m/s2)
1 answer
(120g*3)/0.6 = ___
You can
ask a new question
or
answer this question
.
Related Questions
A block and tackle having a velocity ratio of 5 is used to raise a load of 400N through a distance of 10m. If the work done
The efficiency of a machine is 60℅,find In joules the work done by a student using the machine to rise a load of 150kg through
The efficiency of a machine is 80% calculate the work done by a person using the machine to raise a load of 300kg through a
The efficiency of a machine is 80%. Determine the work done by a person using this machine to raise a load of 200kg through a
A machine raises a load of 600N through a height of 1.5m when an effort of 100N moves a total distance of 20m.(a) calculate the
a machine was used to lift a load of 30N through a distance of 2metres. the effort applied was 10N through a distance of
The efficiency to machine is 75% , if this machine raises a load of 150kg , through a vertical height of 20m,calculate the
Which machine has the highest efficiency?
machine/ output work (j)/ input work (j) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000
a simple machine moves a load of 400N through a distance of 10cm when a force of 20N is applied to it.if the distance moved by
A machine with velocity ratio 5 requires 1000J of work o raise a load of 600N through a vertical distance of 1.25m
find i.work