What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground?

Responses

100 J

100 J

200 J

200 J

400 J

400 J

600 J

The quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground can be calculated by using the formula for work:

Work = force x distance

Given:
Force = 100 N
Distance = 6 m - 2 m = 4 m

Substituting the values into the formula, we get:

Work = 100 N x 4 m = 400 J

Therefore, the quantity of work done in this scenario is 400 J.