List the dams for the production of electricity in Nigeria

1. Jebba Hydroelectric Power Plant

2. Kainji Hydroelectric Power Plant
3. Shiroro Hydroelectric Power Plant
4. Zungeru Hydroelectric Power Plant
5. Gurara Hydroelectric Power Plant
6. Dadin Kowa Hydroelectric Power Plant
7. Challawa Hydroelectric Power Plant
8. Tiga Hydroelectric Power Plant
9. Oyan Hydroelectric Power Plant
10. Ikere Gorge Dam Hydroelectric Power Plant

Here is a list of some major dams in Nigeria used for electricity production:

1. Kainji Dam: Located on the Niger River, it is the largest hydroelectric dam in Nigeria. It has a capacity of 760 MW and was commissioned in 1968.

2. Jebba Dam: Also situated on the Niger River, Jebba Dam is another significant hydroelectric power station. It has a capacity of 540 MW and began operating in 1985.

3. Shiroro Dam: Located on the Kaduna River in Niger State, Shiroro Dam is the third-largest hydroelectric dam in Nigeria. It has a capacity of 600 MW and was inaugurated in 1990.

4. Kanji Dam: Situated on the Jebba River in Niger State, Kanji Dam is a multipurpose dam that generates hydroelectricity. It has a capacity of 100 MW and started operations in 1983.

5. Zungeru Dam: Currently under construction on the Kaduna River, Zungeru Dam is expected to have a capacity of 700 MW upon completion. It is projected to commence operations in 2022.

6. Dadin Kowa Dam: Located in Gombe State, Dadin Kowa Dam is a multipurpose dam that includes hydroelectric power generation. It has a capacity of 39 MW and became operational in 2016.

Please note that this list showcases some major dams in Nigeria used for electricity production, and there may be others as well.