Math

posted by .

What is the dollar amount for the cement needed for a sidewald that is 4 inches thick, 3 feet wilde, and 40 feet long if the cement is sold for $76 petr cubic yard. Calculate the problem using fractions to avoid rounding errors caused by repeating decimals.

  • Math -

    Convert all measures to feet and multiply.

    1/3 * 3 * 40 * 3^3 * $76 = ?

  • Math -

    $337.78

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. math

    concrete can be purchased cubic yard. How much will it cost to pour a slab 17 feet by 17 feet by 2 inches for a patio if the concrete costs $40.00 per cubic yard?
  2. math

    How much would it cost to pour a concrete slab for a patio 14 feet by 16 feet and 6" thick if cost is $80 per cubic yard. I know 27cubic feet equals 1 cubic yard, so do I take 14*16 *27 or?
  3. math

    How many cement blocks are needed to construct a wall 0.5 ft. thick, 6 ft. high, and 60 ft. long if it takes 10 standard cement blocks to make 1 cubic foot of wall?
  4. 5th grade math

    bill is replacing the grass in his yard with cement .the yard is 300m long and 100m wide. if cement is 15cents per cm how much would it cost?
  5. Math

    A contractor has been asked to pave 15 miles of new road. Before he can set his price, he needs to know how much the cement will cost. If the road is 45 feet wide and 9 inches thick and the cost of cement is $35 per cubic yard, what …
  6. math((PLEASE HELP!))

    A contractor has been asked to pave 15 miles of new road. Before he can set his price, he needs to know how much the cement will cost. If the road is 45 feet wide and 9 inches thick and the cost of cement is $35 per cubic yard, what …
  7. Consumer Math

    How many cement blocks are needed to construct a wall 0.5 ft. thick, 6 ft. high, and 60 ft. long if it takes 10 standard cement blocks to make 1 cubic foot of wall?
  8. Math

    If a mixture of 24 lb. of cement, 48 lb. of sand, and 63 lb. of gravel is needed to make 1 cubic foot of concrete, how many pounds of sand are needed to pour a pool deck of 156 cubic feet?
  9. Science

    *Cement is 70% CaO by mass *Concrete is 17% cement by mass *Concrete masses 150lbs. per cubic feet *There are 27 cubic feet in a cubic yard *15 cubic yards required for house of concrete. CaCo3(s)---CaO(s)+CO2(g) 1.) How many kg. of …
  10. CULCULS

    CEMENT IS POURED SO THAT IT CONTINUOUSLY FORMS A CONICAL PILE,THE HEIGHT OF W/H IS TWICE THE RADIUS OF THE BASE,IF THE CEMENT IS BEING POURED AT THE RATE OF 12 CUBIC FEET PER SECOND ,HOW FAST IS THE HEIGHT OF THE PILE CHANGING WHEN …

More Similar Questions