Math Linear Programming

posted by .

I need to find out the constraints and the variables so that I can input and solve in excel or management scientist. I don't know how to configure this information, can someone help me?

Tots Toys makes a plastic tricycle that is composed of three major components: a handlebar-front wheel-pedal assembly, a seat and frame unit, and rear wheels. The company has orders for 12,000 of these trikes.

As indicated in the table below, the company obviously does not have the resources available to manufacture everything needed for the completion of 12000 tricycles, so it has arranged to purchase additional components, as necessary. Develop a linear programming model to tell the company how many of each component should be manufactured and how many should be purchased in order to provide 12000 fully completed tricycles at the minimum cost.


Component Plastic Time Space Man$ Pur.$
Front/ 3 / 10/ 2 / 8/ 12
Frame/ 4 / 6/ 2 / 6/ 9
Wheel/ .5 / 2/ .1 / 1/ 3
AVAILABLE /50,000 /160,000 /30,000/

  • Math Linear Programming -

    There are no variables nor constraints stated...yet....

    I suspect the variables will be the three assemblies, and the only constraint implied is that the number of these cannot exceed 12000 each.

    There is not enought stated to determine what the problem is.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. College Algebra

    Maximize the objective function C = 4x + 5y with the constraints x + y 5, x + 2y 6, x 0, y 0. Your constraints don't make sense. They need to be equations. Are you leaving out "=" signs?
  2. business math

    It's a lot of words, but short questions. I got most of it, but I'm confused on a and c. Help would be greatly appreciated: Theater Seven wants to increase its popularity. They want to determine the best number of newspaper (N), Radio …
  3. Linear Programming

    Maximize P = 16x + 80y subject to these constraints: 2x + 20y ≤ 430 4x + 70y ≤ 1400 8x + 30y ≤ 980 10x + 10y ≤ 1000 4x + 30y ≤ 700 x ≥ 0, y ≥ 0 Maximum value for P = ?
  4. linear programming app

    write the constraints as linear inequalities and identify all variables used. A canoe requires 8 hours of fabrication and a rowboat 5 hours. The fabrication department has at most 110 hours of labor available each week
  5. Math/Management

    FuelMotion is an oil company that owns two oil processing plants that produce gasoline from crude oil. Their Georgia Plant produces 2 thousand gallons of premium, 1 thousand gallons of medium, and 6 thousand gallons of regular gasoline …
  6. programming

    Consider the following input and output: INPUT: (((5 + 1) – (7 – 4)) / (11 – 8)) OUTPUT: 5 1 + 7 4 – – 11 8 - / 2.1. What variables do you need to consider for the input?
  7. isds

    When specifying linear constraints, the modeler must take into account the unit specification of the decision variables so that the units represented by the left side of the constraints are consistent with the units represented by …
  8. Linear Programming - The Graphical Method

    Solve the linear programming programming by graphing and then determining which vertex minimizes the objective function G=4x+3y . {5x+15y≥15 {5x+5y≥35 {x≥0 {y≥0 x = y = What is the minimum value?
  9. linear programming problem

    Consider the linear programming problem: Maximize P=60x+50y. x+y≤80 5x+10y≤560 50x+20y≤1600 x≥0 y≥0 Use the simplex method to solve the problem. Use s, t, and u as your slack variables for the first, second, and third inequalities …
  10. Math

    Hi can someone please help me? A recent study gave the information shown in the table about ages of children receiving toys. The percentages represent all toys sold. Age (years) Percentage of Toys 2 and under 3-5 6-9 10-12 13 and over