Math

The Wellbuilt Company produces two types of wood chippers, Deluxe and Economy.
The Deluxe model requires 3 hours to assemble and ½ hour to paint, and the Economy
model requires 2 hours to assemble and 1 hour to paint. The maximum number of
assembly hours available is 24 per day and the maximum number of painting hours
available is 8 per day. If the profit on the Deluxe model is $15 per unit and the profit on
the Economy model is $12 per unit, how many units of each model will maximize profit?
Let x = number of Deluxe models
y = number of Economy models
a. List the constraints
b. Determine the objective function. __________________
c. Graph the set of constraints. Place number of Deluxe models on the horizontal axis
and number of Economy models on the vertical axis.
d. Find the vertices of the feasible region.
Vertices Profit
e. How many Deluxe models and how many Economy models should the Wellbuilt
Company produce to maximize their profit?
Deluxe____________
Economy__________
f. What is the maximum profit? __________________

  1. 👍
  2. 👎
  3. 👁

Respond to this Question

First Name

Your Response

Similar Questions

  1. statistics

    A manufacturer has a maximum of 240, 360, and 180 kilograms of wood, plastic and steel available. The company produces two products, A and B. Each unit of A requires 1, 3 and 2 kilograms of wood, plastic and steel respectively;

  2. algebra

    a candy company has 130 pounds of cashews and 170 pounds of peanuts which they combine into different mixes the deluxe has half cashews and half peanuts and sells for $7 a pound the economy mix has one third cashews and two thirds

  3. MATH

    Kane Manufacturing has a division that produces two models of fireplace grates, x units of model A and y units of model B. To produce each model A grate requires 3 lb of cast iron and 6 min of labor. To produce each model B grate

  4. finite math

    Kane Manufacturing has a division that produces two models of hibachis, model A and model B. To produce each model-A hibachi requires 3 lb of cast iron and 6 min of labor. To produce each model-B hibachi requires 4 lb of cast iron

  1. Geometry

    Max is building a spherical model of earth. He is building his model using 2-inch long pieces of wood to construct the radius. The first time he tries to build the model, he uses 3 of the 2-inch pieces of wood end-to-end to make

  2. math

    Solve the problem. A shirt company has 4 designs that can be made with short or long sleeves. There are 5 color patterns available. How many different types of shirts are available from this company? a. 9 types b. 40 types c. 11

  3. math

    A manufacturer produces a standard model and a deluxe model of a 25-inch (in). television set. the standard model requires 12 h of labor to produce, and the deluxe model requires 18 h. The company has 360 h of labor available per

  4. Math - Linear Inequalities

    The Wellbuilt Company produces two types of wood chippers, Deluxe and Economy. The Deluxe model requires 3 hours to assemble and ½ hour to paint, and the Economy model requires 2 hours to assemble and 1 hour to paint. The maximum

  1. Math

    I seem to be having problems setting up Linear Programming questions. For example: Kustom Kars does van conversions. The Custom conversion required 15 hours of shop time, 8 hours of painting time, and 1 hour of inspection time.

  2. math

    Ace Rubber company manufacture three types of tires: Model P, the premium, Model S, the second line, and Model E, the economy. Model P sells for Birr 95 per tire and costs Birr 85 per tire to make, Model S sells for Birr 78 per

  3. The Graphical Method

    A manufacturer produces two models of mountain bikes. Model A requires 5 hours of assembly time and 2 hours of painting time, and Model B requires 4 hours of assembly time and 3 hours of painting time. The maximum total weekly

  4. math 11

    A small clothing company manufactures two types of jackets. The first type of jacket requires 20 minutes of cutting time and 10 mins of sewing time. The second type requires 10 minutes of cutting and 15 minutes of sewing time. In

You can view more similar questions or ask a new question.