physics

A sledge loaded with bricks has a total mass of 18.9 kg and is pulled at constant speed by a rope inclined at 19.3° above the horizontal. The sledge moves a distance of 19.8 m on a horizontal surface. The coefficient of kinetic friction between the sledge and surface is 0.500. What is the tension on the rope?

  1. 👍 0
  2. 👎 0
  3. 👁 304

Respond to this Question

First Name

Your Response

Similar Questions

  1. physics

    THree blocks of masses 3m, 2m and m are connected to strings A,B, and C. The blocks are pulled along a rough surface by a force of magnitude F exerted by string C. The coefficient of friction between each block and the surface is

  2. Math

    A brick patio has the approximate shape of a trapezoid. The patio has 16 rows of bricks. The first row has a = 13 bricks and the 16th row has b = 28 bricks. How many bricks are in the patio?

  3. MATH

    a pile of bricks has 85 bricks in the bottom row, 79 bricks in the second row, 73 in the third row, and so on until there is only 1 brick in the top row. how many bricks are in the 12th row? how many rows are there in all?

  4. physics

    sledge of mass 80 kg moves over the frozen surface of a lake with a velocity of 30m/s and comes to rest in 5s. find frictional force between the lake and sledge

  1. Physics

    a loaded cart has a total mass of 227kg. if a 312N force acting at an angle of 30 to the ground is applied, how much work is done by moving the cart 15m?

  2. Math

    a pile of bricks has 97 bricks in the first row, 91 bricks in the second row, 85 bricks in the third row, and so on until there is only one brick in the top row how many bricks are in the 15th row

  3. physics

    10. A 2-kg object is moving at 3m/s. A 4-N force is applied in the direction of motion and then removed after the object has traveled an additional 5m. The work done by this force is: A. 12 J B. 15 J C. 18 J D. 20 J E. 38 J ans: D

  4. i need your help please :(

    a loaded cart as a total mass of 227kg.if a 312-N force acting at angle of 30° to the ground is applied, how much work is done in moving the cart 15 meters?

  1. math (algerbra)

    A bricklayer's assistant starts building a wall, laying 50 bricks per hour. Two hours later the master comes and lays down 80 bricks per hour. x= number of hours since the assistant has been laying. Qusestion-------- Write

  2. physics

    A cart loaded with bricks has a total mass of 18 kg and is pulled at constant speed by a rope. The rope is inclined at 30.4  above the horizontal and the cart moves 21.5 m on a horizontal floor. The coefficient of kinetic

  3. Math

    A pile of bricks has 85 bricks in the bottom row, 81 bricks in the second row up, 77 in the third, and so on up to the top row that contains only 1 brick. How many bricks are in the 12th row? I don't know if I'm right but I

  4. Algebra

    A brick staircase has a total of 16 steps The bottom step requires 112 bricks. Each successive step requires 4 fewer bricks than the prior one. How many bricks are required to build the staircase?

You can view more similar questions or ask a new question.