Cost Accounting

What are the differences between job-cost and process-cost systems? When would it be appropriate to use each type of system? How does each system affect the cost of a product?

  1. 👍
  2. 👎
  3. 👁

Respond to this Question

First Name

Your Response

Similar Questions

  1. math/economics in calculus

    The average cost of manufacturing a quantity q of a good, is defined to be a(q) = C(q)/q. The average cost per item to produce q items is given by a(q) = 0.01q2 − 0.6q + 13, for q >0. I know that the total cost is

  2. calc

    The rectangular plot in Figure 23 has size 100 ft by 200 ft. Pipe is to be laid from A to a point P on side BC and from there to C. The cost of laying pipe along the side of the plot is $ 50/ft and the cost through the plot is $

  3. Accounting 7

    Job 31 has a direct materials cost of $300 and a total manufacturing cost of $900. Overhead is applied to jobs at a rate of 200 percent of direct labor cost. Use the relationships among total manufacturing costs, conversion cost,

  4. algebra

    The cost of operating an appliance varies jointly as the number of watts, hours of operation, and the cost per kilowatt-hours. It costs $0.45 to operate a 3000-watt air conditioner for 2 hours at a cost of $0.075 per

  1. Microeconomics

    When average total cost is declining then: a) marginal cost must be less than average cost b) marginal cost must be greater than average cost c) average toal cost must be greater than average fixed cost d) average variable cost

  2. Economics

    Andrew quits his job as an accountant where he earns $60,000 per year to go back to school for two years to get an MBA degree. He attends a school that charges $25,000 per year for tuition and related expenses. How much is the

  3. accounting

    Brooks Inc. uses process costing. The costs for Department 2 for April were: Cost from preceding department $20,000 Cost added by department: Materials $21,816 Labor 7,776 Factory overhead (FOH) 4,104 33,696 -------- The following

  4. Accounting

    Department E had 4,000 units in Work in Process that were 40% completed at the beginning of the period at a cost of $12,500. 14,000 units of direct materials were added during the period at a cost of $28,700. 15,000 units were

  1. Accounting

    Solex Company produces a high-quality insulation material that passes through two production processes. Data for June for the first process follow: Required: 1. Assume that the company uses the weighted-average method of

  2. Accounting for Managers

    Question 11 of 20 5.0 Points Which of the following accurately describes a difference between job order and process costing systems? A. In job order costing systems, overhead costs are treated as product costs, whereas in process

  3. advanced math

    The marginal cost of a product can be thought of as the cost of producing one additional unit of output. For example, if the marginal cost of producing the 50th product is $6.20, it cost $6.20 to increase productionn from 49 to 50

  4. Math

    A caterer charges a fixed cost for preparing a dinner plus an additional cost for each person served. You know that the cost for 100 students will be $750 and the cost for 150 students will be $1050. Find the caterer's fixed cost

You can view more similar questions or ask a new question.