algebra

One paving machine can surface 1 km of highway in 6 hours. Another can surface 1 km of highway in 8 hours. how long would it take to surface 1 km of highway with the two machines working together?

  1. 👍 0
  2. 👎 0
  3. 👁 101
asked by Steven

Respond to this Question

First Name

Your Response

Similar Questions

  1. Cost accounting

    Red River Products uses a normal cost, job order costing system. In the Mixing Department, overhead is applied using machine hours; in Paving, overhead is applied using direct labor hours. In December 2007, the company estimated

    asked by Josephine on October 7, 2009
  2. MATH

    1. A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 60 hours; the second machine at most 30 hours; and the third machine at most 80 hours. The first product

    asked by ANGELLA on May 12, 2014
  3. Science

    Am I correct with my answeres below? During which hours of the day is the earth's emitted radiation highest and Why? My Answer: I think it is in the afternoon because of the increase in surface temperature. Why are values of LW^

    asked by Mama Mia on March 9, 2009
  4. science

    which of the following descriptions of the moon's surface is accurate? a) the moon's surface is wet and smooth b) the moon's surface is dry and irregular c) the moon's surface has mountains and oceans d) the moon's surface is

    asked by victoria on November 13, 2013
  5. astronomy

    2. We ultimately want to find the amount of solar energy that hits the observer on the planet. Energy is usually measured in Joules, but there are other appropriate units of energy as well; kilowatt-hours for example, are used to

    asked by Luis on July 15, 2012
  6. Math

    Manufacturing A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 70 hours; the second machine at most 40 hours; and the third machine at most 90 hours. The first

    asked by Claudia on March 1, 2014
  7. Math

    Manufacturing A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most hours; the second machine at most hours; and the third machine at most hours. The first product

    asked by Claudia on March 1, 2014
  8. Math

    A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 70 hours; the second machine at most 40 hours; and the third machine at most 90 hours. The first product requires

    asked by Ally on September 27, 2013
  9. Math

    Barb is going to cover a rectangular area 8 feet by 10 feet with rectangular paving blocks that are 4 inches by 8 inches by 2 inches to make a flat patio. What is the minimum number of paving blocks she will need if all the paving

    asked by Anonymous on May 2, 2015
  10. Physics

    Emma is working in a shoe test lab measuring the coefficient of friction for tennis shoes on a variety of surfaces. The shoes are pushed against the surface with a force of 400 N, and a sample of the surface material is then

    asked by BT on July 30, 2016

More Similar Questions