maths

A contractor supplied some items to a school. The contractor's bill is shown below. If each amount includes 5% VAT calculate how much the government receives as VAT. Electrical fittings = #52 500.Stationery #84 000 ;sports equipments #262 000;computers #672 000; school lockers #157 500.

  1. 0
  2. 0
  3. 3
asked by Frank ch
  1. VAT = 0.05*(52,500+84,000+262,000+672,000+157,000) =

    1. 0
    2. 0
    posted by Henry

Respond to this Question

First Name

Your Response

Similar Questions

  1. maths

    A contractor supplied some items to a school. The contractor's bill is shown below. If each amount includes 5% VAT calculate how much the government receives as VAT. Electrical fittings = #52 500.
  2. Project Mangament

    I am doing on a project on Building Home Depot. how would I go to found the cost, construction engineer, roofing contractor, plumbing contractor, HVAC contractor, steel erection and electric contractor. Install temporary power,set
  3. Math

    The Mulraneys hired a contractor to build an addition to their home. The Contractor proposed a rectangular room with an area of 300 square feet. The Mulraneys asked the contractor to change the area to 363 feet by increasing both
  4. Math

    An engineer’s plan shows a canal with a trapezoidal cross section that is 8 ft deep and 14 ft across at the bottom with walls sloping outward at an angle of 45°. The canal is 620 ft long. A contractor bidding on the job
  5. algebra word problem

    To remodel a bathroom a contractor Charles $25 er hour plus material costs, which amount to $3825. Therefore, the total cost to remodel he bathroom is given by f(x)=25x+3825 where x is the number of hours the contractor works.
  6. algebra

    It took a contractor 1285 hours to manufacture their first unit of an item. If the contractor expects to acheive a 92% unit learning curve, how many hours would be required to manufacture units 51-100/
  7. Math

    f a contractor pays an average wage of $20.00 per hour and wants to make a 15% mark-up on the cost of labour, what will the contractor charge as an average labour cost on contracts?
  8. math

    If a contractor pays an average wage of $20.00 per hour and wants to make a 15% mark-up on the cost of labour, what will the contractor charge as an average labour cost on contracts?
  9. Math

    Math 10 pre calc chpt 1 In a basement renovation, the contractor measured the length of a wall in a square room as 18ft.4in. The width of the doorway is 3 ft. The contractor plans to place wood trim along the bottom of each wall.
  10. Math

    Please help Ms.Sue! a contractor's designing one side of an office building 48 feet in length the windows are each 5 feet long and will be placed Six feet apart and 5 feet from the end of the building wall how many windows can a

More Similar Questions