A company builds bicycles. Their fixed cost is 300,000 and it costs $500 to make each bicycle(labor,materials,etc.)

A)What is the cost equation and what is the average cost per bicycle?

B)If the revenue equation is -3x^2+3200x where x is the number of bicycles, how many bicycles does the company need to sell to maximize profits?

  • College Algebra -

    C(x) = 300000+500x
    avgC(x) = C(x)/x = 300000/x + 500

    P(x) = R(x)-C(x) = -3x^2 + 2700x - 300000
    = 3(-x^2 + 900x - 100000)

    max P(x) at -900/-2 = 450

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. algebra

    Aki's Bicycle Design has determined that when x hundred bicycles are built, the average cost per bicycle =0.9x^2-1.7x+10.861, when C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the average cost …
  2. MATH

    The equation C(x) = 100x+100,000/x models the average cost (C(x)) for a manufacturer to produce x bicycles. How many bicycles must be produced to bring the average cost per bicycle to $125?
  3. Algebra 2

    I apologize for that. I didn't realize I didn't write the whole problem. Thank you for pointing that out to me. Aki's Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by c(x) …
  4. math

    Aki’s Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by , where is in hundreds of dollars. How many bicycles should the shop build in order to minimize the average cost …
  5. Algebra 2

    Aki's Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by c(x) =0.1x^2 -0.5x+ 9.295. Where C(x) is in hundreds of dollars, how many bicycles should the shop build to minimize …
  6. Algebra

    Aki’s Bicycle has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x)=-0.2x^2-0.1x+9.743, where C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the …
  7. algabra

    Aki’s Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x) = 0.1x^2-1.2x+9.457, where C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize …
  8. algebra

    Average cost of a bicycle is modeled by the function c(x)=.1x^2-1.7x+10 where c(x) is measured in dollars. how many bicycles should be built in order to minimize the average cost per bicycle?
  9. Algebra

    The RideEm Bicycles factory can produce 140 bicycles in a day at a total cost of $10,200 and it can produce 160 bicycles in a day at a total cost of $10,900. What are the company's daily fixed costs?
  10. college algebra

    Aki's Bicycle Designs has determined that when x hundred bicycles are​ built, the average cost per bicycle is given by​ C(x) =0.1x^2−1.4x+8.096​, where​ C(x) is in hundreds of dollars. How many bicycles should the shop build …

More Similar Questions