Markov chains

posted by .

A company has 2 machines. On any day, each machine that is working has a 1/3 chance of breaking down. If a machine breaks down during the day, it is sent to a repair facility and will be working 2 days after it breaks down. Letting the state of the system be the number of machines working at the beginning of the day, formulate a transition probability matrix for this situation.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Intro to Probability

    Widgets are produced at a certain factory by each of three machines A, B and C. These machines produce 1000, 600 and 400 widgets per day, respectively. The probability that a given widget is defective is 4% for one produced by Machine …
  2. math

    In any triangle the sum of the measures of the angles is 180. In triangle ABC, A is three times as large as B and also 16 larger than C. Find the measures of each angle. I also would like to know how to solve these problems: In isosceles …
  3. math

    A machine is either working (state 1) or not workind (state 2). If it is working one day the probability that it will be broken the next day is 0.1. If it is not working one day the probability that it will be working the next day …
  4. math

    A machine is either working (state 1) or not workind (state 2). If it is working one day the probability that it will be broken the next day is 0.1. If it is not working one day the probability that it will be working the next day …
  5. bus stats

    A manufacturing company has 5 identical machines that produce nails. The probability that a machine will break down on any given day is .1. Define a random variable X to be the number of machines that will break down in a day. a. what …
  6. simplex Method

    A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of product A and a profit of $4/unit of product B. To manufacture 1 unit of product A …
  7. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  8. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  9. math- im really confused! please help!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  10. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …

More Similar Questions