A time study of operations yielded the following observed times for one element of the job; the analyst gave a performance rating of 1.13. Using an allowance of 20%, determine the appropriate standard time for this operation.
Observations Time, x
1 1.12
2 1.15
3 1.16
4 1.12
5 1.15

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Advanced Production

    The data in the following table represent time-study observations on a new operation with three work elements. On the basis of these observations, find the standard time for the process. Assume an 8% allowance factor. Element-1,2,3. …
  2. Operations Management

    A job has a normal time of 12 minutes a performance rating of .80, and an allownmce factor of 20 percent of job time. The standard time for this job in minutes is: A. 11.52 b. 12 c. 14.4 d. 15
  3. stat

    An employer wants to set a time limit so that 75% of the employees will finish a job on time. Past history has shown that the time required to do the job is normally distributed and has a mean time of 26 minutes with a standard deviation …
  4. statistics

    A sample of the number of study per week of college students is collected. Some of the sample results of the survey are given in the following table Study Hr 4, 10, 20,24, 34, 36, 42 Z score -2.5,-1.75,-0.5,0, 1.25,1.5,2.25 P. Rank …
  5. math

    Given the following information, determine the sample size needed if the standard time estimate is to be within 5 percent of the true mean 99 percent of the time. Work Element Standard Deviation (minutes) Mean Observed Time (minutes) …
  6. business

    An estimate of the time required to perform a certain job is needed. The study yielded a mean of 6.4 minutes and a standard deviation of 2.1 minutes. The desired confidence is 0.95. How many observations will be needed if the desired …
  7. Math

    The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for …
  8. Accounting

    The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for …
  9. Math

    The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for …
  10. business msis

    A time study of a certain service task found an average time of 15 minutes, with a standard deviation of 5minutes. These figures were based on a sample of 100 measurements. Is the sample large enough that we are 95% confident that …

More Similar Questions