algebra

posted by .

Machine A produces nails at a uniform rate of 60 every 20 seconds and machine B produces them at 50 every 10 seconds. If the two machines run simultaneously, how many seconds would it take to produce a total of 400 nails?

  • algebra -

    Rate of A = 60 nails / 20 sec = 3 nails/sec
    rate of B = 50 nails / 10 sec = 5 nails/sec

    combined rate = 8 nails/sec

    time at combined rate = 400/8 seconds
    = 50 seconds

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  2. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  3. statistics

    A machine produces 49 titanium bolts every 2 hours. At this rate how many bolts does the machine produce in 36 minutes?
  4. math1

    (ii) A factory has two machines. Past records show that the first machine produces 40% of output and the second machine produces 60% of output. Further 4% and 2% of the products produced by the first machine and the second machine …
  5. Math

    A factory has 3 machines that produce the same item. Machines 1 and 2 each produce 30% of the total output, while machines 3 produce 40%. It is known that 6% of Machine 1's output is defective, while machine 2 produces 5% defective …
  6. mathematics

    A bell rings every 2 seconds, and a bird chirps every 3 seconds. If the ring ant the chirp occur together right now, they will occur together in A. 40 seconds B. 41 seconds C. 42 seconds D. 43 seconds
  7. Math

    A bell rings every 2 seconds, and a bird chirps every 3 seconds. If the ring and the chirp occur together right now, they will occur together in A. 40 seconds B. 41 seconds C. 42 seconds D. 43 seconds
  8. Quantitative, stastics and business

    A company has three machines A, B and C which all produce the same two parts, X and Y. of all the parts produced, machine A produces 60%, machine B produces 30%, and machine C produces the rest. 40% of the parts made by machine A are …
  9. Physics

    A student makes ice cream using an old-fashioned hand-crank machine. He does 40 joules of work each time he turns the crank in a complete circle. The crank handle makes a circular path with a diameter of 0.5 meters. The student turns …
  10. calculus

    In electrical engineering, a continuous function like f(t)=sin(t), where t is in seconds, is referred to as an analog signal. To digitize the signal, we sample f(t) every ∆t seconds to form the sequence Sn= f(n∆t). For example, …

More Similar Questions