math

posted by .

alright.. this is the linear programming question i got..
JJ Manufacturing has three factories (1,2,3) and three distribution centers (A,B,C). shipping costs from the factories to the distrubution centers is as follows

from factory 1 to center A: $6
from factory 2 to center A: $8
from factory 3 to center A: $11

from factory 1 to center B: $5
from factory 2 to center B: $10
from factory 3 to center B: $14

from factory 1 to center c: $3
from factory 2 to center A: $8
from factory 3 to center A: $18

production capability of fact 1 = 6000
production capability of fact 2 = 8000
production capability of fact 3 = 10000

demand at distributtion center A = 7000
demand at distributtion center B = 12000
demand at distributtion center C = 5000

the product is is produced and deliverd in a lot size of 100


im at a total blank at how to write the objective function and contraints. can u please help me with this ASAP! :)

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. math / linear programming

    Two factories manufacture 3 different grades of paper. The company that owns the factories has contracts to supply at least 16 tons of low grade, 5 tons of medium grade, and at least 20 tons of high grade paper. It costs $1000 per …
  2. inter

    4. Canning Transport is to move goods from three factories to three distribution centers. Information about the move is given below. Give the network model and the linear programming model for this problem.Canning Transport is to move …
  3. maths linear programming

    alright.. this is the question i got.. JJ Manufacturing has three factories (1,2,3) and three distribution centers (A,B,C). shipping costs from the factories to the distrubution centers is as follows from factory 1 to center A: $6 …
  4. math214

    Given three buildings A, B, and C, utility centers for electricity (E), gas (G), and water (W), determine whether it is possible to connect each of the three buildings to each of the three utility centers without crossing lines.
  5. Math 221 Week3

    A distribution center receives shipment of a product from three different factories in the quantities of 60, 35 and 25. Three times a product is selected at random, each time without replacement. Find the probability that (a) all three …
  6. Math 221

    A distribution center receives shipment of a product from three different factories in the quantities of 60, 30 and 20. Three times a product is selected at random, each time without replacement. Find the probability that (a) all three …
  7. us history

    Which answer best describes why high numbers of children were hired to work in factories in the 1800s?
  8. History

    7.)Which answer correctly explains why most factories were located along the eastern coast?
  9. Social Studies

    How could the North's factories be considered an advantage?
  10. Social studies

    How did zoning laws help to reduce the danger from pollution?

More Similar Questions