Please check my answer thanks :)

Ifan enrollee uses more services than originally assumed per the PPPM calculation, the the plan would

1. show a pfofit for that period
2. show a loss of that period
3. need a contract renegotiation
4. require that the enrollee be dropped from that plan.

I picked 3

Number 2 is the answer it's on page 271 in your textbook