Which possible solution would have the lowest initial cost? (1 point) Responses refuse to grant a permit for construction or renovation of a mall refuse to grant a permit for construction or renovation of a mall build a smaller shopping center build a smaller shopping center build the mall on an area already cleared but on the other side of town build the mall on an area already cleared but on the other side of town renovate an existing mall using recycled materials

Refusing to grant a permit for construction or renovation of a mall would have the lowest initial cost, as it requires no expenditure.