Question 5 (Marks: 20)

You have just been made the team lead for a project and have been tasked with selecting your
team. You want to ensure that you have a high-performance team. Answer the questions below
regarding your considerations for selecting this team. It is your choice if the project will be a
Software Development or Infrastructure (Networking) project.
Q.5.1 Create a checklist - which includes a brief explanation of each step provided in
the list that can be used to ensure that the project is put through a Quality
Assure (QA) process.
(10)
Q.5.2 Create an infographic that provides the team with more information on the
Software Development or Infrastructure (Networking) project

Q.5.1 Checklist for Quality Assurance (QA) process in a Software Development or Infrastructure (Networking) project:

1. Define the Quality Standards: Clearly outline the quality standards that the project needs to meet. This includes specifying the expected performance, functionality, security, and usability requirements.

2. Develop a Test Plan: Create a comprehensive test plan that outlines the different types of testing to be performed, such as unit testing, integration testing, system testing, and user acceptance testing. It should also include the testing resources, schedule, and responsibilities.

3. Establish Test Environment: Set up a dedicated test environment that closely resembles the production environment. This involves configuring the required hardware, software, network settings, and test data.

4. Perform Functional Testing: Test each component of the project to ensure that it works according to the specified requirements. This involves identifying test cases, executing them, and tracking the results.

5. Conduct Integration Testing: Test the interaction between different components or modules to ensure proper communication and functionality. This includes verifying data flow, compatibility, and error handling.

6. Implement Performance Testing: Evaluate the project's performance under different scenarios, such as heavy load, concurrent users, and peak usage. Measure response times, throughput, and resource utilization to identify and address any performance bottlenecks.

7. Conduct Security Testing: Verify the project's security measures and resistance to threats. Assess the system's vulnerability to attacks, including penetration testing, code reviews, and network scanning.

8. Perform User Acceptance Testing (UAT): Involve end-users in the testing process to validate whether the project meets their expectations and is user-friendly. Collect feedback, track issues, and work towards resolving them.

9. Track and Resolve Issues: Establish a process for capturing, tracking, and managing issues discovered during testing. Prioritize and resolve these issues promptly, ensuring proper communication and collaboration across the team.

10. Review and Document Test Results: Review all test results and document them for future reference. This includes recording test coverage, defects found, resolved issues, and any lessons learned during the QA process.

Q.5.2 Infographic for Software Development or Infrastructure (Networking) Project:

[The infographic will include relevant information about the project, such as its goals, objectives, timeline, team composition, key milestones, and deliverables. It should also highlight the project's overall strategy, resources required, and any specific technical details or challenges involved. The design of the infographic should be visually appealing, easily understandable, and able to capture the attention of the team members.]