Questions LLC
Login
or
Sign Up
Ask a New Question
Mathematics
Basic Arithmetic
Addition
A construction company bought a load of concrete for $432 and a load of bricks for $292. How much did the company spend on these supplies?
1 answer
The construction company spent $432 on concrete and $292 on bricks, so the total amount spent on these supplies is $432 + $292 = $<<432+292=724>>724. Answer: \boxed{724}.
You can
ask a new question
or
answer this question
.
Related Questions
A simple lever is used to lift a heavy load. When a 60-N force pushes one end of the lever down 1.2 m, the load rises 0.2 m.
A company makes concrete bricks that are shaped like rectangular prisms. Each brick is
6 inches long, 3 inches wide, and 2 inches
A forklift lifts a 900-Newton load 5 meters high. It then carries this load to a horizontal distance of 20 meters. Determine the
the load which a crane can lift up is directly proportional to the mass and inversely proportional to the height throught which
A simple lever is used to lift a heavy load. When a 60-N force pushes one end of the lever down 1.2 m, the load rises 0.2 m.
A 12,5kW single-phase inductive load operation at a power factor of 0,75 lagging is connected to a 240V supply. Each conductor
An electric motor is used to lift a load of bricks through a vertical height of 20m.the tension in the cable attached to the
a load 500N is raised 0.2m by a machine in which an effort of 150N moves 1m. what is the work done on the load?
A 1500 W winch is used to raise a load of bricks to a height of 25m. If the bricks need to reach this height in 1.5 minutes.
The farmer sells a 41.9915-tonne load to a buyer who takes a
single scoop of tomatoes from a random spot in the load. If the