math

A crew needs to pick up litter along one side of a section of highway that is 49.5 kilometers long.

How many kilometers must the crew clean each day in order to finish the job in 5.5 days?

A 0.11km
B 0.9 km
C 9.0 km
D 11.2 km

  1. 👍 0
  2. 👎 0
  3. 👁 82
  1. 49.5 / 5.5 = 9 km/day

Respond to this Question

First Name

Your Response

Similar Questions

  1. word problem

    Millwood city is constructing a new highway through town. The construction crew can complete 5 3/6 miles of road each month. The total new highway will be 54 miles long. Will the highway be finished in 8 months? I know that 36 2/5

    asked by Jared on February 15, 2013
  2. help asap plz

    A 15-person road crew is scheduled to finish repairing a highway in 12 days. On the morning of the fifth day, several new workers join the crew and, together, they complete the remaining repairs in 6 days. How many new workers

    asked by PLEASE HELP :) on May 20, 2016
  3. math problem

    In her first litter, a young cat gave birth to two kittens. Her second litter included six kittens. What percent is the second litter of the first litter? PLZ EXPLAIN!!!

    asked by anonymous on October 25, 2013
  4. Math

    Millwood City is constructing a new highway through town. The construction crew can complete 5 3/5 miles of road each month. 6Can the highway be finished in 8 months?

    asked by Millwoof on May 12, 2015
  5. Math

    Surveyors with a highway planning crew measure a section of proposed roadway to be 4.4 km. They measure the angle of inclination over the 4.4 km to be 8.5 degrees. Determine the change in altitude for drivers travelling from one

    asked by Anonymous on November 16, 2014
  6. math

    Mr. Mitchells office is on a winding side road next to a highway exit.He is driving on the highway at 60mph, and at this rate he expected to arrive at his office at 8:45a.m.However at 8:30 he was forced to leave the highway and

    asked by nancy on March 16, 2009
  7. Calculus

    A section of highway connecting two hillsides with grades of 6% and 4% is to be build between two points that are separated by a horizontal distance of 2000 feet. At the point where the two hillsides come together, there is a

    asked by Jon on December 3, 2007
  8. Calculus

    A section of highway connecting two hillsides with grades of 6% and 4% is to be build between two points that are separated by a horizontal distance of 2000 feet. At the point where the two hillsides come together, there is a

    asked by Jon on December 4, 2007
  9. Math

    Millwood City is constructing a new highway through town. The construction crew can complete 5 3/5 miles of road each month. Can the highway be finished in 8 months? 6 1/2 months have already passed by and so far they have 36 2/5

    asked by First Name on May 12, 2015
  10. math

    The ochestra at stripling middle school is responsible for cleaning a 15 mile highway. there are 45 students in the orchestra. If each member cleans and equal section, what decimal represents this section? A.0.3 B.0.33 C.o.3333...

    asked by kimberly fidhlsgdhlkghs on October 4, 2007

More Similar Questions