Questions LLC
Login
or
Sign Up
Ask a New Question
Questions
Science
what is a machine?
1 answer
http://www.merriam-webster.com/dictionary/machine
You can
ask a new question
or
answer this question
.
Similar Questions
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine D
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine C
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine A
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
Machine C
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
The efficiency of a machine is determined by the ratio of output work to input work. For machine A,
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine C
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
The machine with the highest efficiency is Machine C.
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
To find the machine with the highest efficiency, we need to calculate the efficiency of each machine
Read more.
Machine Output Work (J) Input Work (J)
A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000 Which machine has the highest
Top answer:
The efficiency of a machine is calculated by dividing the output work by the input work and
Read more.
Question
Use the table to answer the question. Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000
Top answer:
Machine C has the highest efficiency because it produces the most output work (450 J) compared to
Read more.
Related Questions
The efficiency to machine is 75% , if this machine raises a load of 150kg , through a vertical height of 20m,calculate the
1. A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 60
In a factory, machine A, B and C produce electronic components. Machine A produces 16% of the components, machine B produces 50%
a machine was used to lift a load of 30N through a distance of 2metres. the effort applied was 10N through a distance of
A machine with velocity ratio 5 requires 1000J of work o raise a load of 600N through a vertical distance of 1.25m
find i.work
How does this image relate to the Jacobins?
A. The Jacobins invented this machine, which began the Industrial Revolution. B. The
A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to
Oaktree Company purchased a new machine and made the following expenditures:
Purchase price $45,000 Sales tax 2,200 Freight
Force and Work Unit Test
9 of 129 of 12 Items Question Use the table to answer the question. Machine Output Work (J) Input Work
Kiddy Toy Corporation needs to acquire the use of a machine to be used in its manufacturing process. The machine needed is