  1. Problems of this type are solvable by means of the following.

    If it takes one person 5 hours to paint a room and another person 3 hours, how long will it take to paint the room working together?

    1--A can paint a room in 5 hours.
    2--B can paint a room in 3 hours.
    3--A's rate of painting is 1 room per A hours (5 hours) or 1/A (1/5) room/hour.
    4--B's rate of painting is 1 room per B hours (3 hours) or 1/B (1/3) room/hour.
    5--Their combined rate of painting is therefore 1/A + 1/B = (A+B)/AB = (1/5 + 1/3) = (8/15) rooms /hour.
    6--Therefore, the time required for both of them to paint the 1 room working together is 1 room/(A+B)/AB rooms/hour = AB/(A+B) = 5(3)/(5+3) = 15/8 hours = 1 hour-52.5 minutes.

    Note - Generally speaking (if the derivation is not specifically required), if it takes one person A units of time and another person B units of time to complete a specific task working alone, the time it takes them both to complete the task working together is T = AB/(A + B), where AB/(A + B) is one half the harmonic mean of the individual times, A and B.

    You might like to derive the equivalant expression involving 3 people working alone and together which results in T = ABC/(AB + AC + BC).

    1. 👍 0
    2. 👎 0

Respond to this Question

First Name

Your Response

Similar Questions

  1. Math

    Barry can do a certain job in 3 hours, whereas it takes Sanchez 5 hours to do the same job. how long would it take them to do the job working together?

    asked by Chadene on March 12, 2009
  2. math

    Michael and Barry can complete a job in 2 hours when working together. If Michael requires 6 hours to do the job alone, how many days does Barry need to do the job alone?

    asked by vinci on July 16, 2013
  3. math

    Alex takes 3 hours longer to complete a certain job than Barry does. If they can complete the job by working together in 3.6 hours, how long would it take Alex to complete the job working alone? 3.

    asked by fred on February 1, 2012
  4. math

    A father can do a job in a certain number of hours. His son takes twice as long to do the job. Working together, they can do the job in 6 hours. How many hours does it take the father to do the job alone?

    asked by Irene Wu on September 16, 2014
  5. math algebra

    Gray Glaze requires 15 hours to put a new roof on a house. His apprentice, Anna Gandy, can record the house by herself in 20 hours. After working alone on a roof for 6 hours, Gary leaves for another job. Anna takes over and

    asked by jacky on November 19, 2016
  6. math

    8 workers together at the same rate finished a painting job in 5 hours. hour long would it take 12 such workers working at the same rate to finish the same job? each worker finished____(fraction) of the job in one hour. 12 workers

    asked by Jonathan on April 13, 2007
  7. linear equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by nmh on July 8, 2011
  8. System of Linear Equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by neeha on July 8, 2011
  9. math

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by tina on July 8, 2011
  10. Algebra II

    I don't exactly understand what needs to be done in this problem. Could someone please explain what I am supposed to be doing a bit clearer than the book? Four jobs need to be done, and four workers are available. The chart shows

    asked by Codie on August 23, 2007