math- im really confused! please help!!

A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below.

Product X:-
Machine A: 1
Machine B: 2
Machine C: 2

Product Y:
Machine A:2
Machine B: 2
Machine C: 2

Product Z:
Machine A:2
Machine B: 1
Machine C:4

The machines are available for 200, 525 and 350 hours each month. How many units of each product can be manufactured per month if all three machines are utilized to their full capacity?

  1. 👍 0
  2. 👎 0
  3. 👁 90
asked by kim
  1. I saw this same question yesterday , tried it and got nowhere.

    The way I see it :
    for machine A : x + 2y + 2z = 200
    for machine B : 2x + 2y + z = 525
    for machine C : 2x + 2y + 4z = 350

    solving these I got
    x = 266 1/3
    y = 25
    z = -58 1/3

    these answers satisfy the above equations, but of course make no sense.... (can't produce negative number of products)

    Perhaps somebody else could look at this and see an error in my thinking.
    Or ...., the problem could be flawed.

    1. 👍 0
    2. 👎 0
    posted by Reiny
  2. The problem makes no sense. With constraints (machine time), and costs (time on each machine for each product), this would make sense if there was a profit function, which there is not.

  3. This is an incomplete linear programming problem I suspect.

    1. 👍 0
    2. 👎 0
    posted by Damon
  4. A company has three machines A, B and C which all produce the same two parts, X and
    Y. of all the parts produced, machine A produces 60%, machine B produces 30%, and
    machine C produces the rest. 40% of the parts made by machine A are part X, 50% of the
    parts made by machine B are part X, and 70% of the parts made by machine C are part X.
    A part produced by this company is randomly sampled and is determined to be an X part.
    With the knowledge that it is an X part, find the probabilities that the part came from
    machine A, B or C.

    1. 👍 0
    2. 👎 0
    posted by Tofik

Respond to this Question

First Name

Your Response

Similar Questions

  1. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2

    asked by Anonymous on July 10, 2011
  2. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2

    asked by kIM on July 11, 2011
  3. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2

    asked by kIM on July 11, 2011
  4. simplex Method

    A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of product A and a profit of $4/unit of product B. To manufacture 1 unit of product

    asked by Leah on April 24, 2011
  5. statistic

    . A company is considering installing new machines to assemble its products. The company is considering two types of machines, but it will buy only one type. The company selected eight assembly workers and asked them to use these

    asked by jessika on September 24, 2010
  6. finite

    0/20 points | Previous Answers TanFin11 4.1.034. Ask Your Teacher My Notes Question Part Points Submissions Used A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will

    asked by Anonymous on March 6, 2015
  7. statistics

    A company is considering installing new machines to assemble its products. The company is considering two types of machines, but it will buy only one type. The company selected eight assembly workers and asked them to use these

    asked by Jose on January 23, 2011
  8. statistic

    A company is considering installing new machines to assemble its products. The company is considering two types of machines, but it will buy only one type. The company selected eight assembly workers and asked them to use these

    asked by Jose on January 23, 2011
  9. Math

    Manufacturing A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 70 hours; the second machine at most 40 hours; and the third machine at most 90 hours. The first

    asked by Claudia on March 1, 2014
  10. Math

    Manufacturing A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most hours; the second machine at most hours; and the third machine at most hours. The first product

    asked by Claudia on March 1, 2014

More Similar Questions