Questions LLC
Login
or
Sign Up
Ask a New Question
Physics
Thermodynamics
Heat Transfer
If 150 g of water is heated from 3.0 celieus to 48.0 celieus how many joules of heat are needed
1 answer
q = mass H2O x specific heat H2O x delta T. Note the correct spelling of celsius.
You can
ask a new question
or
answer this question
.
Similar Questions
If 150 g of water is heated from 3.0 celieus to 48.0 celieus how many joules of heat are needed
Top answer:
To calculate the amount of heat needed to raise the temperature of a substance, you can use the heat
Read more.
If 150 g of water are heated from 20.ºC to 30. ºC,the nunber of joules of heat energy absored is
Top answer:
q=mct c is the specific heat in j per gram times degree celsius 150g*(4.18)(10)=6270 J
Read more.
if 150 grams of water is heated from 20 degrees C to 30 degrees C, the number of joules of heat energy aborbed is?
Top answer:
q = mass H2O x specific heat H2O x (Tfinal-Tinitial)
Read more.
A 37.0 g mass of a metal was heated to 100°C and then plunged into 74 g of water at 24.0°C. The temperature of the resulting
Top answer:
a. joules H2O absorbed = mass H2O x spcific heat H2O x (Tfinal-Tinitial) b. joules absorbed by H2O =
Read more.
What amount of heat is required to raise the temperature of 20 grams of water from 10°C to 30°C? The specific heat of water is
Top answer:
20 g ( 4.18 J/g deg C )(30 deg C-10 deg C) = 1672 J which is closer to 1700 than to anything else on
Read more.
A sample of water is heated from 35 C to 45 C with 1600 joules. What is the mass of the sample?
A 15-gram sample of water has an
Top answer:
You can work all of these with one of two or three formulas. 1. q = mass sample x specific heat
Read more.
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force x distance a 1.7 Joules b 0.6 Joules c 1500
Top answer:
d. 150 Joules
Read more.
How much work is required for a 30 kg dog to pull a sled 50 meters? Work = force x distance a 150 Joules b 1.7 Joules c 1500
Top answer:
The work required to pull the sled can be calculated by multiplying the force applied by the
Read more.
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force × distance O a О b •O c 0 d 0.6 Joules 150
Top answer:
The amount of work required to pull the sled can be calculated using the formula: Work = force x
Read more.
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force x distance a 150 Joules b 1.7 Joules c 0.6
Top answer:
There is not enough information given to determine the force exerted by the dog, so the answer
Read more.
Related Questions
A machine’s efficiency is determined to be 60%. The input work is 3,000 joules. What is the output work?
A) 180,000 joules B)
A small pebble is heated and placed in a foam cup calorimeter containing 25.0 mL of water at 25.0 degrees Celsius.The water
A person raises a box with a weight of 50 newtons by 0.5 meter. How much work does the person do in this action?(1 point)
Respons
A 1.0 kg ball is bounced high in the air. What is its total kinetic energy when it reaches its highest point?
a 30.0 joules b 0
Using calories, calculate how much heat 32.0g of water absorbs when it is heated from 25.0 degrees C to 80.0 degrees C. How many
Skate Park Lab
Energy of Skateboarder Height Speed Potential Energy Kinetic Energy Total Energy 6m 0 m/s² 4,704 Joules 0 Joules
Which describes a characteristic of water that is responsible for frost wedging?(1 point)
Responses Water expands as it freezes.
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force x distance a. 1.7 Joules b. 1500 Joules c. 0.6
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force x distance a 1.7 Joules b 1500 Joules c 150
How much work is required for a 30 kg dog to pull a sled 50 meters?
Work = force x distance a 1.7 Joules b 1500 Joules c 150