1 answer
work = force * distance
F (weight) = mg
You can
ask a new question
or
answer this question
.
Similar Questions
The efficiency of a machine is 80% calculate the work done by a person using the machine to raise a load of 300kg through a
Top answer:
work = force * distance But you only get to use 80% of the work input. That means that 0.8W =
Read more.
A machine with velocity ratio 5 was used to raise a load of 1.2kg mass through a height of 10m, if the workdone to raise the
Top answer:
Why now? Please help me I need to do my assignment
Read more.
A machine with v.r 5 was used to raise a load of 1.2kg mass through high of 10m. If the workdone to raise the load is 800j find
Top answer:
Well, well, well! Let's calculate the useful work output, efficiency, and mechanical advantage of
Read more.
The efficiency of a maching is 80%.determine the workdone by a person using his machine to raise a load of 200kg through a
Top answer:
increase of potential energy = m g h = 200 * 10 * 3 = 6,000 Joules 6,000 /0.80 = 7500 Joules
Read more.
The efficiency of a machine is 60%. Find in joules the workdone by a student using this machine to raise a load of 150kg through
Top answer:
To find the work done by the student, we need to use the formula: Work = force x distance The force
Read more.
The efficiency of a machine is 75%.If this machine raises a load of 150kg through a vertical height of 20cm,Calculate the
Top answer:
(m * g * h) / efficiency convert cm to m ... answer is in Joules
Read more.
The efficiency to machine is 75% , if this machine raises a load of 150kg , through a vertical height of 20m,calculate the
Top answer:
weight = force = m g = 150 * 10 work = force * distance = 150 * 10 * 20 = 30,000 Joules work out =
Read more.
A block and tackle have 4 pulleys which is used to raise a load of 450N through a height of 12m. If the workdone against
Top answer:
work on load = 450 N * 12 m = 5.4kJ effort distance = 4 * 12 m = 48 m effort work = 1000 J + 5.4 kJ
Read more.
A block and tacle of 6 pulley is used to raise a load of 300n steadily through a height of 30m if the workdone against friction
Top answer:
work accomplished = 300*30 = 9,000 J applied work = 9,000 + 2,000 = 11,000 Joules efficiency = 100 *
Read more.
A machine has a efficiency of 60% calculate the work done by a person using the machine to raise a load of 120kg through a
Top answer:
(120g*3)/0.6 = ___
Read more.
Related Questions
A machine has a velocity ratio of 6 and an efficiency of 75%. Calculate the effort needed to raise a load of 90N
The floor of a lorry is 2.0m high. A plank 5m long is used as an inclined plane to raise some load up the lorry. If the
A block and tackle having a velocity ratio of 5 is used to raise a load of 400N through a distance of 10m. If the work done
A machine of efficiency 80% is used to raise a load of body of mass 75kg through a vertical height of 3m in 30seconds.Calculate
A block and tackle has a velocity ratio of 4 and it is used to vertically raise a load of mass 50kg.if the effciency is
The efficiency of a machine is 80%. Determine the work done by a person using this machine to raise a load of 200kg through a
A machine raises a load of 600N through a height of 1.5m when an effort of 100N moves a total distance of 20m.(a) calculate the
For a given machine the load moves 2 m when the effort moves 8m,if an effort of 20 N is used to raise a load of 60N, what is the
a machine was used to lift a load of 30N through a distance of 2metres. the effort applied was 10N through a distance of
A machine with velocity ratio 5 requires 1000J of work o raise a load of 600N through a vertical distance of 1.25m
find i.work