math

It takes 8 hours for one crew to clean an office building. It takes a second crew 10 hours to clean the same building. If the first crew works 2 hours and leaves and the second crew takes over to complete the job, how long will it take the second crew to finish cleaning the building?

  1. 👍 1
  2. 👎 0
  3. 👁 579
  1. 1/8-1 hour
    2/8- 2 hours

    2/8+1/10x=1
    1/10x=6/8
    x=7.5 hrs

    1. 👍 1
    2. 👎 0
  2. let the work to be done be 1 unit

    rate of first crew = 1/8
    job done by first crew in 2 hours = 2(1/8) = 1/4
    job left to be done = 1 - 1/4 = 3/4

    rate of second crew = 1/10
    time needed for 2nd crew to finish
    = (3/4) / (1/10)
    = 30/4 hrs or 7.5 hrs

    1. 👍 2
    2. 👎 0
    posted by Reiny

Respond to this Question

First Name

Your Response

Similar Questions

  1. Math

    The time it takes to clean the house varies inversely with the number of people cleaning. If it takes 1 person 4 hours to clean the house, how long will it take 3 people? 12 hours

    asked by M on April 15, 2015
  2. algebra

    Solve A contractor finds that it takes a crew A 6 hours to construct a wall of a certain size. Crew B takes 8 hours to construct a wall of the same size. How long will it take if they work together?

    asked by Marta on April 27, 2010
  3. Maths

    you need to go on a trip to other ancient sites. Your plane takes off at 10:00 am from an airfield, and flies at 120 km/h on a bearing of 325 degrees T. your crew and equipment are in a second (incorrect flight) plane that takes

    asked by Jay on July 29, 2016
  4. Algebra

    Working alone, it takes Julia 16 hours to clean an attic. Lea can clean the same attic in 15 hours. If they worked together how long would it take them?

    asked by Fidelis on January 18, 2017
  5. math

    Suppose that the time (in hours) required to repair a machine is an exponentially distributed random variable with parameter λ (lambda) = 0.5. What's the probability that a repair takes less than 5 hours? AND what's the

    asked by raksha on October 28, 2007
  6. math

    Amy can clean the house in 7 hours. When she works together with Tom, the job takes 5 hours. How long would it take Tom, working by himself, to clean the house?

    asked by john on July 23, 2012
  7. linear equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by nmh on July 8, 2011
  8. math

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by tina on July 8, 2011
  9. System of Linear Equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to

    asked by neeha on July 8, 2011
  10. math

    A library crew can shelve books in six hours. Another crew can do the job in four hours. If the first crew begins and is joined by the second crew one hour later, how many hours will it take to finish the job?

    asked by jessica on July 26, 2011