Questions LLC
Login
or
Sign Up
Ask a New Question
Mathematics
Algebra
Word Problems
Tom takes three days to do a piece of work while Jerry takes only one day for the same. Together they both can finish the job in 15 days so how many days will tom will finish the work
1 answer
Stop posting the same stupid question. It has been answered enough times already. Look below if you really need a solution.
You can
ask a new question
or
answer this question
.
Related Questions
Tom the cat is chasing Jerry the mouse across a table surface 1.5 m off the floor. Jerry steps out of the way at the last
When Sarah takes the bus to work, the trip takes 30 minutes. When she takes the train to work, the trip takes 20 minutes. The
Tom and Jerry were at a State Fair. They each got a ticket for the Merry Go Round. Tom got a funnel cake, and Jerry got a
1. Tom and Jerry had a total of 64 stamps at first. After giving 7 stamps to Tom, Jerry had the same number of stamps as Tom.
When Sarah takes the bus to work, the trip takes 30 minutes. When she takes the train to work, the trip takes 20 minutes. The
A MAN SAVED #8 THE FIRST DAY #16 THE SECOND DAY #32 THIRD DAY AND SO ON.HOW MANY DAYS WOULD IT TAKES HIM TO SAVE A TOTAL SUM OF
Tom and Jerry are working together to weed the garden. Working together it takes them 2 hours and 24 minutes. If it takes Tom
It takes a woman 12 minutes to drive one way to work. She goes home for lunch 3 days each week. How much time does she spend
Tom and Jerry were at a State Fair. They each got a ticket for the Merry Go Round. Tom got a funnel cake, and Jerry got a
tom takes 3days to do a piece of work while jerry takes only one day for the same. together, they both can finish the job in 15