A construction expected a new project from start to finish to take 12 weeks. The crew will work 7 days a week. In how many days will the project be complete. Explain how you could check your answer to be sure it's correct.

How do you think this problem should be solved? I'll be glad to check your answer.

I don't how I need help

You have two numbers. You have four choices about what to do with them.

Add?
Subtract?
Multiply?
Divide?

Which method will give you a reasonable answer?

To determine the number of days it will take to complete the project, we first need to convert the given 12 weeks into days. Since there are 7 days in a week, multiplying 12 weeks by 7 days per week will give us the total number of days for the project.

Calculating:

12 weeks * 7 days/week = 84 days

Therefore, the project will be completed in 84 days.

To check if this answer is correct, we can use simple math. Since the crew works 7 days a week, we can calculate the number of weeks it will take to complete the project by dividing the total number of days (84) by 7.

Calculating:

84 days รท 7 days/week = 12 weeks

Since we started with 12 weeks, and our calculation confirms the duration, the answer is likely correct.

However, there are a few additional ways to double-check the answer:

1. Verify the given information: Make sure that the initial information provided is accurate and reliable.

2. Use estimation: Break down the overall project into smaller tasks or milestones. Assign an estimated duration for each task, sum up these durations, and see if it aligns with the given answer (84 days).

3. Cross-reference with historical data: If available, analyze data from previous similar projects to see if their durations were similar or aligned with the calculated answer.

4. Consult with experts: Seek the input of experienced individuals in the construction industry who have expertise in project planning and scheduling. They can review the information and calculations to validate or provide feedback on the estimated duration.

By utilizing these methods, we can confidently verify the accuracy of the answer and ensure that the project will likely be complete in 84 days.