Posts by randa

Total # Posts: 17

Corporate Finance
You have been asked to estimate the value of a 10-year bond with a coupon that will be low initially but it is expected to grow later in the bond’s life. The coupon is expected to be 5% of the face value of the bond (which is $ 1000) for the first 5 years, and will ...

Corporate Finance
You have just taken a 30-year mortgage loan for $200,000. The annual percentage rate on the loan is 8%, and payments will be made monthly. Estimate your monthly payments.

algebra
the sum of five times a number and nine times the same number

math
Randy’s car can drive 5 miles in 2 minutes. How many miles can he drive in 60 minutes?

math
Pool length (m) 9 Depth of pool (m) 1.6 Pool length (ft) 29 Is it correct to write that 9m (metric system) is 29 feet

physics
A bungee jumper falls for 1.3 seconds before the bungee cord begins to stretch. Until the jumper has bounced back up to this level, the bungee causes the jumper to have an acceleration upward of 4 m/s2. a. How fast is the jumper going when the bungee cord begins to stretch? (...

math
Given the quadratic function f(x) = x2 – 12x + 36, find a value of x such that f(x) = 25.

Math
I need help with math and I cant understand it

marketing
In what stage of the product life cycle is cake mix in the U.S.?

Algebra
a vehicle uses 1 tablespoon to drive 125 yards. How many miles can the vehicle travel per gallon? (Hint 256 tablespoons egual a gallon)

Algebra
a vehicle uses 1 tablespoon to drive 125 yards. How many miles can the vehicle travel per mile?

algebra
no i am stuck on how to figure this out

systems analysis task
Jesse would also like to see a lower-level diagram for each of the four processes that you identify in diagram 0. You can label the data flows in a general manner on the context diagram, then go into more detail in the lower-level diagrams.

systems analysis task
Jesse wants to see a context diagram and a diagram 0 DFD for TIMS. Be sure to include at least four processes in the diagram 0 DFD.

systems analysis task
1.Jesse wants to see a context diagram and a diagram 0 DFD for TIMS. Be sure to include at least four processes in the diagram 0 DFD.

Math
square with sides of 18.3 m

spell
hot to spill 22