Math

posted by .

Pedro built nine bicycles in 25 h. At this rate, how many bicycles will he build in a 40 h week.

  • Math -

    Cross multiply and solve for x.

    9/25 = x/40

  • Math -

    I got a decimal, do i round it off ?

  • Math -

    I suggest you leave it as a decimal.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. algebra

    Aki's Bicycle Design has determined that when x hundred bicycles are built, the average cost per bicycle =0.9x^2-1.7x+10.861, when C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the average cost …
  2. Algebra 2

    I apologize for that. I didn't realize I didn't write the whole problem. Thank you for pointing that out to me. Aki's Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by c(x) …
  3. math

    Aki’s Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by , where is in hundreds of dollars. How many bicycles should the shop build in order to minimize the average cost …
  4. Algebra 2

    Aki's Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by c(x) =0.1x^2 -0.5x+ 9.295. Where C(x) is in hundreds of dollars, how many bicycles should the shop build to minimize …
  5. Algebra

    Aki’s Bicycle has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x)=-0.2x^2-0.1x+9.743, where C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the …
  6. algabra

    Aki’s Bicycle Designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x) = 0.1x^2-1.2x+9.457, where C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize …
  7. math

    A factory produces bicycles at a rate of 80+0.3t^2−1.1t bicycles per week (t in weeks). How many bicycles were produced from day 15 to 21?
  8. algebra

    AKI'S bicycyle designs has determined that when x hundreds bicycles are built the average cost per bike is given C(x)=0.1x^2-1.4x+10.766. Where C(x)is in hundreds of dollars. How many bicycles should the shop build to minimize the …
  9. Math Calc

    A factory produces bicycles at a rate of 100+0.4t2−0.7t bicycles per week (t in weeks). How many bicycles were produced from day 15 to 28?
  10. college algebra

    Aki's Bicycle Designs has determined that when x hundred bicycles are​ built, the average cost per bicycle is given by​ C(x) =0.1x^2−1.4x+8.096​, where​ C(x) is in hundreds of dollars. How many bicycles should the shop build …

More Similar Questions