To determine if the highway will be finished in 8 months, we need to calculate the average completion rate of the highway construction.

First, we need to calculate the rate of construction in miles per month. The total length of the highway is 54 miles, and the construction period is 8 months. Therefore, the average construction rate would be:

54 miles / 8 months = 6.75 miles per month

Now, we can compare this rate to the total length of the highway. If the rate equals or exceeds the total length of the highway, then the highway will be finished in 8 months. If the rate falls short, the construction will take longer than 8 months.

In this case, since the rate is 6.75 miles per month and the total length of the highway is 54 miles, the highway will be finished within 8 months.