The capacity of the groundwater treatment plant has recently been expanded to receive an additional 50,000 m3/year.
As a result, all of the 6 rapid sand filtration are being operated. Assume a peak flow factor of 1.5. If the filtration rate is 5 m/h, what would be the area of each filter?

Each filter has an area of (m2):

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Water treatment

    The capacity of the groundwater treatment plant has recently been expanded to receive an additional 50,000 m3/year. As a result, all of the 6 rapid sand filtration are being operated. Assume a peak flow factor of 1.5. If the filtration …
  2. Chemistry

    The capacity of the groundwater treatment plant has recently been expanded to receive an additional 50,000 m3/year. As a result, all of the 6 rapid sand filtration are being operated. Assume a peak flow factor of 1.5. If the filtration …
  3. Water Treatment

    Based on the treatment scheme, what type(s) of raw water is / are being treated?
  4. waste water treatment

    QF Description Wastewater from a small town is treated in a trickling filter which is preceeded by a screen, sand-removal and primary clarification. The maximum hydraulic capacity, or peak flow, of the treatment plant is 1,500 m3/h. …
  5. Water Treatment

    Wastewater from a small town is treated in a trickling filter which is preceeded by a screen, sand-removal and primary clarification. The maximum hydraulic capacity, or peak flow, of the treatment plant is 1,500 m3/h. The dry weather …
  6. waste water treatment

    Wastewater from a small town is treated in a trickling filter which is preceeded by a screen, sand-removal and primary clarification. The maximum hydraulic capacity, or peak flow, of the treatment plant is 1,500 m3/h. The dry weather …
  7. environmental engineering

    A water treatment plant has 6 settling tanks that operate in parallel (the flow gets split into six equal flow streams), and each tank has a volume of 600m3. If the flow to the plant is 10 mgd, what is the retention time in each of …
  8. waste water

    Wastewater from a small town is treated in a trickling filter which is preceded by a screen, sand-removal and primary clarification. The maximum hydraulic capacity, or peak flow, of the treatment plant is 1,500 m³/h. The dry weather …
  9. Waste water treatment

    In wastewater treatment, what is the required open screen area (m2) for reaching this screen velocity during treatment of the rain weather flow when dimension of the pre-treatment unit for the wastewater treatment plant is receiving …
  10. Wastewater Treatment

    In wastewater treatment, dimension the following pre-treatment unit for a wastewater treatment plant receiving a dry weather flow (dwf) of 18,000 m3/day. Assume that flow doubles during rain. A bar screen is used to remove the coarse …

More Similar Questions

Post a New Question