math

posted by .

jenny's company has two photocopying machines, one of which is older and slower than the other. In fact, the newer machine can put out four-thirds as many copies as the older machine in the same amount of time. If, while running at the same time, together they produce 560 copies, how many copies did each machine produce?

  • math -

    rate of older machine === 1 unit/unit of time
    rate of newer machine === 4/3 units/unit of time

    combined rate = 1 + 4/3 = 7/3 units/unit of time

    (7/3)x = 560
    x = 240

    The slower did 240 copies
    and the faster did (4/3)(240) or 320 copies

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. math

    There are two machines that produce aluminum cans. The newer machine can produce 7200 cans in 200 minutes. It takes the older machine 300 minutes to produce that many cans. If the two machines work together, how long will it take them …
  2. simplex Method

    A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of product A and a profit of $4/unit of product B. To manufacture 1 unit of product A …
  3. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  4. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  5. math- im really confused! please help!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  6. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  7. algebra

    A new machine that deposits cement for a road requires 13 hours to complete a one-half mile section of road. An older machine requires 15 hours to pave the same amount of road. After depositing cement for 2 hours, the new machine develops …
  8. math

    A new machine that deposits cement for a road requires 13 hours to complete a one-half mile section of road. An older machine requires 15 hours to pave the same amount of road. After depositing cement for 2 hours, the new machine develops …
  9. math

    A new machine that deposits cement for a road requires 13 hours to complete a one-half mile section of road. An older machine requires 15 hours to pave the same amount of road. After depositing cement for 2 hours, the new machine develops …
  10. Algebra

    One copy machine can run off copies in 170 minutes. A newer machine can do the same job in 119 minutes. How long does it take the two​ machines, working​ together, to make all of the necessary​ copies?

More Similar Questions