Math

posted by .

It takes one man one day to dig a 2m x 2m x 2m hole. How long does it take 3 men working at the same rate to dig a 4m x 4m x 4m hole?

x = rate of one man = 23 m3/ 1 day = 8m3/day
3x = rate of three men = 3(8m3/day) = 24m3/day
64m3/(24m3/day) = 2 2/3 days
Is this correct?

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. pre calc

    Sam Bordner can dig his garden in 4 hours end Elsie Bordner takes the same amount of time. After working together for an hour, their son Gregory helps them finish in just 30 minutes. How long would it have taken gregory to dig the …
  2. math..word problem

    A landscaper dug holes. It takes him 1 hour to dig a hole 2 feet deep, 2 feet long and 2 feet wide. Assuming everything remains the same, how many hours would it take him to dig a hole 4 feet deep, 4 feet long and 4 feet wide?
  3. Math

    A landscaper is digging holes it takes him one hour to dig a hole 2 feet deep, 2 feet long and 2 feet wide. Assuming everything remains the same, how many hours would it take him to dig a hole 4 feet deep, 4 feet long and 4 feet wide?
  4. World History Honors

    What exactly is this assignment asking me to do?
  5. English

    1. Dig a hold 2 feet deep. 2. Dig a hole for 2 feet deep. (Are both OK?
  6. Maths

    If it takes 6 men 4h to dig a hole 6m deep,how long will it take 10 men to dig a hole 5m deep?
  7. Algebra

    It takes 15 men working steadily 4 days to dig the foundation for a new apartment. How many days would it have taken 25 men working at the same rate to dig the foundation?
  8. maths

    If it takes five men six hours to dig seven holes, how long does it take one man to dig half a hole?
  9. maths

    If 14 men can dig a hole 10 metres long in 6 days, how long would 12 men take to dig a hole 15 metres long?
  10. Math

    It takes 3 men to dig 2 identical trenches in 5 hours.If all the men work at same rate,how long will it take 5 men to dig 7 of these trenches?

More Similar Questions