The optimal total shipping cost in a minimization transportation model is $622, and the reduced cost from source node 1 to destination node 6 is $6. This implies that if one were to deviate from the optimal solution by shipping one unit from node 1 to node 6, the new minimum total shipping cost would be $628

True or False

  • ISDS -

    true

  • ISDS -

    True

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Econ

    For a typical negative externality market graph, with Demand curve (also labelled private value), and supply curve (private cost) and a social cost curve above the supply curve. What is the optimal quantity that maximizes total economic …
  2. business

    The table given below provides the shipping costs and supply available at each source. Find the minimum-cost shipping solution for the transportation problem. Provide a table of shipping quantities and the minimum value for the objective …
  3. the lagrange multiplier equation

    A cylindrical oil-storage tank is to be constructed for which the following costs apply: cost per square meter metal for sides $30.00 (cost per square meter) combined costs of concrete base and metal bottom $37.50(cost per square meter) …
  4. math-optimal diameterand height

    A cylindrical oil-storage tank is to be constructed for which the following costs apply: cost per square meter metal for ides $30.00 combined costs of concrete base and metal bottom $37.50(cost per square meter) top 7.50 (cost per …
  5. Stats

    Consider the Avionic Manufacturing Company that wishes to meet a demand of 10 units per month by purchasing the items from a vendor with a lead time of three-quarters of a month. The item cost is $2.50 per unit, replenishment cost …
  6. Quantitative methods

    Missouri Mineral Products (MMP) purchases two unprocessed ores from Bolivia Mining, which it uses in the production of various compounds. Its current needs are for 800 pounds of copper, 600 pounds of zinc, and 500 pounds of iron. The …
  7. lagrange multipliers

    A cylindrical oil-storage tank is to be constructed for which the following costs apply: cost per square meter metal for ides $30.00 combined costs of concrete base and metal bottom $37.50(cost per square meter) top 7.50 (cost per …
  8. Science

    Intrinsic control of heartbeat rate involves what mechanism(s)?
  9. Micro economics

    Consider a firm with the following production function: q = (ak+bl)^(1/2) The firm's total costs can be written as C = F + rk + wl 1. Calculate the firm's contingent factor demand. Illustrate it in a graph including the firm's isoquant …
  10. isds

    The optimal total shipping cost in a minimization transportation model is $622, and the reduced cost from source node 1 to destination node 6 is $6. This implies that if one were to deviate from the optimal solution by shipping one …