physics

posted by .

a rock climber weights 550N and is carrying a backpack that weighs 50N. how much total work has been done after she climbs 12m

  • physics -

    W = F*d = 600*12 = 7200 Joules.

  • physics -

    lj

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Physics

    A small first aid kit is dropped by a rock climber who is descending steadily at 1.5 m/s. A.)After 3.1s, how far is the kit below the climber?
  2. physics

    A 85 kg rock climber first climbs 50 m up to the top of a quarry, then descends 75 m from the top to the bottom of the quarry. If the initial height is the reference level, find the potential energy of the system (the climber plus …
  3. physics

    A rock climber climbs a 15 m vertical rock wall while wearing a 5.3 kg backpack. How much work does the climber do on the backpack?
  4. physics

    A rock climber climbs a 15 m vertical rock wall while wearing a 5.3 kg backpack. How much work does the climber do on the backpack?
  5. physics

    11. You did 150. J of work lifting a 120.-N backpack. a. How high did you lift the backpack?
  6. physics

    joe weighs 650N. how much work does he do if he climbs 4m up a a rope?
  7. science

    How much total work is done by 450-N girl who lifts a 52-N backpack 1.2m to her shoulders and then climbs a ladder 3.0m high?
  8. Physics

    You are carrying a backpack across campus. What is the work done by your verticals carrying force on the backpack?
  9. physics

    The coefficient of static friction between a skier and the snow is 0.16, with a coefficient of kinetic friction of 0.13. The skier weighs 550N. How much force directed parallel to the horizontal surface is required for the skier to …
  10. Math Functions

    Please help me.. A mountain climber begins a hike at an elevation of 6000 feet. She then climbs such that her elevation increases by 1000 feet per hour. Let x = the amount of time that the climber has been hiking, in hours. Let E(x) …

More Similar Questions