posted by .

A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. How many units of A and B can be produced and finished if exactly 24 hours are available in each department and all hours must be used?

**I know the answer is 8 but i don't know how to do it and create the equation to get to that answer. **

  • Math -

    Let the number of A's be x
    let the number of B's be y

    for the production: 3x + 5y = 24
    for the finishing : 6x + 2y = 24

    double the first and subtract the 2nd
    8y = 24
    y = 3
    sub back into the 1st:
    3x + 15 = 24
    x = 3

    So they must make 3 A's and 3 B's

    check: to product A takes 9 hours, to produce B takes 15 hours for a total of 24 in production.
    to finish A takes 18 hrs, and it takes 6 hrs for B for a total of 24 hrs to finish.
    my answer checks out.

    I have not clue how or from where you got 8.
    8 what? it makes no sense.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. statistic

    The accounting department at Weston Materials, Inc., a national manufacturer of unattached garages, reports that it takes two construction workers a mean of 32 hours and a standard deviation of 2 hours to erect the Red barn model. …
  2. System of Linear Equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  3. linear equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  4. math

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  5. help making equations

    Superbats, Inc., manufactures two different quality of wood baseball bats, the Wallbanger and the Dingbat. The Wallbanger takes 8 hours to trim and turn on a lathe and 2 hours to finish it. It has a profit of $17. The Dingbat takes …
  6. math

    a manufacturer markets 2 products. each unit of Product A requires 3 hours in the moulding department, 4 hours in the Paint Shop, 1 Hour in Finishing. Each unit of B requires 3 hours in moulding, 2 hours Painting, and 2 hours finishing. …
  7. Algebra

    A manufacturer produces a 4-cup and 8-cup coffee maker. The 4-cup maker takes 6 hours to produce and the 8-cup takes 9 hours. The manufacturer has at most 500 hours of labor per week. a. Write an inequality to represent the number …
  8. math

    A manufacturer produces a 4-cup and 8-cup coffee maker. The 4-cup maker takes 6 hours to produce and the 8-cup takes 9 hours. The manufacturer has at most 500 hours of labor per week. a. Write an inequality to represent the number …
  9. math

    A company makes two products , namely X and Y. Each product must be processed in 3 stages; welding , assembly and painting. Each unit X takes 2 hours in welding, assembling 3 hours and 1 hour in painting. Each unit Y takes 3 hours …
  10. Math 1324

    A manufacturer produces two models of elliptical cross-training exercise machines. The times for assembling, finishing, and packaging model A are 3 hours, 3 hours, and 0.8 hour, respectively. The times for model B are 4 hours, 2.5 …

More Similar Questions