linear programming

posted by .

A manufacturer has a maximum of 240, 360, and 180 kilograms of wood, plastic and steel available. The company produces two products, A and B. Each unit of A requires 1, 3 and 2 kilograms of wood, plastic and steel respectively; each unit of B requires 3, 4 and 1 kilograms of wood, plastic and steel respectively, and each unit of B requires 3, 4 and 1 kilograms of wood, plastic and steel respectively. The profit per unit of A and B is $4.00 and $6.00 respectively.
Identify all constraints.
Identify all applicable corner points of the feasibility region.
How many units of A and B should be manufactured in order to maximize profits? What would the maximum profit be?

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Math Linear Programming

    I need to find out the constraints and the variables so that I can input and solve in excel or management scientist. I don't know how to configure this information, can someone help me?
  2. math

    The Wyndsor Glass Co produces high quality windows and glass doors. It has three plants. – Plant 1 makes aluminum frames – Plant 2 makes wood frames – Plant 3 makes glass and assembles the products The company wants to introduce …
  3. math

    The Wyndsor Glass Co produces high quality windows and glass doors. It has three plants. – Plant 1 makes aluminum frames – Plant 2 makes wood frames – Plant 3 makes glass and assembles the products The company wants to introduce …
  4. linear programming app

    solve this linear programming problem; A chain saw requires 4 hours of assembly and a wood chipper 6 hours. A maximum of 48 hours of assembly time is available. The profit is $150 on a chain saw and $220 on a chipper. How many of each …
  5. math

    A manufacturer has a maximum of 240, 360, and 180 kilograms of wood, plastic and steel available. The company produces two products, A and B. Each unit of A requires 1, 3 and 2 kilograms of wood, plastic and steel respectively; each …
  6. math

    A manufacturer has a maximum of 240, 360, and 180 kilograms of wood, plastic and steel available. The company produces two products, A and B. Each unit of A requires 1, 3 and 2 kilograms of wood, plastic and steel respectively; each …
  7. business

    The Pyrotec Company produces three electrical products-clocks, radios and toasters. These products have the following resources requirements : Resource Requirements Cost/Unit Labor Hours/Unit Clock $7 2 Radio 10 3 Toaster 5 2 The manufacturer …
  8. linear programming

    The Pyrotec Company produces three electrical products-clocks, radios and toasters. These products have the following resources requirements : Resource Requirements Cost/Unit Labor Hours/Unit Clock $7 2 Radio 10 3 Toaster 5 2 The manufacturer …
  9. statistics

    A manufacturer has a maximum of 240, 360, and 180 kilograms of wood, plastic and steel available. The company produces two products, A and B. Each unit of A requires 1, 3 and 2 kilograms of wood, plastic and steel respectively; each …
  10. Math

    A candy manufacturer makes two types of special candy, say A and B. Candy A consists of equal parts of dark chocolate and caramel and Candy B consists of two parts of dark chocolate and one part of walnut. The company has in stock …

More Similar Questions