linear equations

posted by nmh

A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. How many units of A and B can be produced and finished if exactly 24 hours are available in each department and all hours must be used?

  1. Ashly

    2400

Respond to this Question

First Name

Your Answer

Similar Questions

  1. System of Linear Equations

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  2. math

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  3. Math

    A manufacturer makes two products A and B, each of which is processed in two departments, production and finishing. Each A takes 3 hours to produce and six hours to finish, whereas each B takes 5 hours to produce and 2 hours to finish. …
  4. Algebra 2 (Linear Programming)

    A bicycle builder makes two models. The basic model requires 2 hours of frame construction, 4 hours of assembly, and 1 hour of finishing. The deluxe model requires 3 hours of frame construction, 3 hours of assembly, and 2 hours of …
  5. help making equations

    Superbats, Inc., manufactures two different quality of wood baseball bats, the Wallbanger and the Dingbat. The Wallbanger takes 8 hours to trim and turn on a lathe and 2 hours to finish it. It has a profit of $17. The Dingbat takes …
  6. math

    a manufacturer markets 2 products. each unit of Product A requires 3 hours in the moulding department, 4 hours in the Paint Shop, 1 Hour in Finishing. Each unit of B requires 3 hours in moulding, 2 hours Painting, and 2 hours finishing. …
  7. Algebra

    A manufacturer produces a 4-cup and 8-cup coffee maker. The 4-cup maker takes 6 hours to produce and the 8-cup takes 9 hours. The manufacturer has at most 500 hours of labor per week. a. Write an inequality to represent the number …
  8. math

    A manufacturer produces a 4-cup and 8-cup coffee maker. The 4-cup maker takes 6 hours to produce and the 8-cup takes 9 hours. The manufacturer has at most 500 hours of labor per week. a. Write an inequality to represent the number …
  9. math

    A company makes two products , namely X and Y. Each product must be processed in 3 stages; welding , assembly and painting. Each unit X takes 2 hours in welding, assembling 3 hours and 1 hour in painting. Each unit Y takes 3 hours …
  10. Math 1324

    A manufacturer produces two models of elliptical cross-training exercise machines. The times for assembling, finishing, and packaging model A are 3 hours, 3 hours, and 0.8 hour, respectively. The times for model B are 4 hours, 2.5 …

More Similar Questions