Ma

posted by .

Autoparts Inc. produces three types of parts' assemblies: (P,Q,R)and they each require (2,5,3) units of work on machine I and (2,2,4) units of work on machine II respectively. The two machines have respectively (160,190) units of work available per day. It is given that their profits are: (10,12,9) dollars respectively.

Assume that the production is given by x,y,z respectively and construct the following:

The profit function to be maximized is:?

The restriction imposed by machine I is:
? <= ?.

The restriction imposed by machine II is: ? <= ?.

Assume that the total production of the product P is required to be greater than or equal to the total production of the other two. Then we get the constraint: x >= ?.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Math

    Autoparts Inc. produces three types of parts' assemblies: (P,Q,R)and they each require (2,5,3) units of work on machine I and (2,2,4) units of work on machine II respectively. The two machines have respectively (160,190) units of work …
  2. simplex Method

    A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of product A and a profit of $4/unit of product B. To manufacture 1 unit of product A …
  3. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  4. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  5. math- im really confused! please help!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  6. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  7. Operations Management 10th edition

    The three station work cell illustrated in Figure S7.7, has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. Station 1-Machine A-Capacity: 20 units/hr Station 2-Capacity: …
  8. Math

    A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit of Product A and a profit of $6/unit of Product B. To manufacture …
  9. math

    A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $2/unit of Product A and a profit of $7/unit of Product B. To manufacture …
  10. math

    A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $2/unit of Product A and a profit of $7/unit of Product B. To manufacture …

More Similar Questions