math- check me

posted by .

(-3)/(5)y=-15

Does y=25

  • math- check me -

    no. First multiply both sides by 5y, giving you
    -3=-45y, then divide by -45
    -3/-45 = y this reduces to 1/15

  • math- check me -

    The way that Jena typed her question, her answer is correct

    (-3)/(5)y=-15
    or
    (-3/5)y = -15
    -3y = -75
    y = 25

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. Math

    At a quality control checkpoint on a manufacturing assembly line, 8% of the items failed check A, 10% failed check B, and 2% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  2. Math

    At a quality control checkpoint on a manufacturing assembly line, 8% of the items failed check A, 10% failed check B, and 2% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  3. Math

    At a quality control checkpoint on a manufacturing assembly line, 8% of the items failed check A, 10% failed check B, and 2% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  4. math

    At a quality control checkpoint on a manufacturing assembly line, 8% of the items failed check A, 10% failed check B, and 2% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  5. math

    how would I check this on my own? I know you put numbers in the place of the letters but when I do that I come up with my moms answer. this is what i have when I check my work. p=-2 q=3 6*(-2)*3 =-36 but 3(-2)(-2*3)=36 could you tell
  6. Math

    At a quality control checkpoint on a manafacturing assembly line, 10% of the items failed check A, 12% failed check B, and 3% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  7. Math

    At a quality control checkpoint on a manafacturing assembly line, 10% of the items failed check A, 12% failed check B, and 3% failed both checks A and B. a. If a product failed check A, what is the probability that it also failed check …
  8. Math

    Can someone please help me. At a quality control checkpoint on a manafacturing assembly line, 10% of the items failed check A, 12% failed check B, and 3% failed both checks A and B. a. If a product failed check A, what is the probability …
  9. Math 157

    Can someone please help me. At a quality control checkpoint on a manafacturing assembly line, 10% of the items failed check A, 12% failed check B, and 3% failed both checks A and B. a. If a product failed check A, what is the probability …
  10. Accounting

    A check returned by a bank because the issuer's cash account balance could not cover the check is called a(n): a. Cancelled check b. Certified check c. Outstanding check d. NSF check

More Similar Questions