Systems operations management

posted by .

Taylor Inc. manufactures widgets. There is a particular assembly line for Widget X. This assembly line includes the assembly of various raw materials, subassemblies, and packing of the finished widget. Currently, approximately 27% of the total labor time is utilized in walking by assembly line personnel to obtain the needed parts required to accomplish their assigned tasks. The average hourly cost, including all benefits, is $43 per hour. Seventeen people are required on the assembly line. Lifting containers that weigh approximately 42 pounds is required in several of the respective tasks. The current output of finished widgets is 208 per 8-hour shift. The company incurs an average of four worker’s compensation claims per year in back injuries due to lifting. An average claim equals $109,000 and the employee is out for an average of 280 hours. The injured worker must be replaced to sustain production. By improving the physical layout, productivity may be improved and worker’s comp claims reduced. Two layouts have been proposed.

Alternative One reduces wasted motion (walking) to 1% of total labor used on the assembly line. Physical lifting is reduced to no more then 12 pounds. Six people will be required on the assembly line. Productivity in finished goods per 8-hour shift will increase to 392. It is anticipated that worker’s comp claims will be reduced to .3 per year; however, a capital investment of $1.3 million is required in robotics and mobile storage carts. Useful life of the equipment is 7 years.

Alternative Two reduces wasted motion to 7% of total labor time while physical lifting is reduced to no more then 23 pounds. Nine people are required to staff the assembly line. Productivity will be 288 widgets per 8-shift. Worker’s comp claims are estimated at 1.9 per year. Capital investments are $967,000 with a useful life of 5 years for the equipment.

• Write a 350- to 500-word executive summary that provides justification for the particular alternative you select. As part of your justification, provide.

o a cost-benefit matrix that compares the alternatives showing the cost-benefit for each alternative.
o the effects the alternative will have on productivity.
o possible benefits of using a network strategy to streamline operational procedures.

Note. The lowest cost alternative may not be the best alternative.

  • Systems operations management -

    1.a cost-benefit matrix that compares the alternatives showing the cost-benefit for each alternative.
    2.the effects the alternative will have on productivity.
    3.possible benefits of using a network strategy to streamline operational procedures.

  • Systems operations management -

    o A cost-benefit matrix that compares the alternatives.
    o The effects the alternative will have on productivity.
    o Possible benefits of using a network strategy to streamline operational procedures.

  • Systems operations management -

    answer for both

  • Systems operations management -

    A cost-benefit matrix that compares the alternatives.

  • Systems operations management -

    cost benefit matrix comparing alternatives for widgets

  • Systems operations management -

    Possible benefits of using a network strategy to streamline operational procedures.

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. calc

    Please help me you guys, this is the 3rd time I have posted this question. Is anybody going to help me with this problem?
  2. Intro to Probability

    Widgets are produced at a certain factory by each of three machines A, B and C. These machines produce 1000, 600 and 400 widgets per day, respectively. The probability that a given widget is defective is 4% for one produced by Machine …
  3. business

    2. Individual Assignment: Widget Production • Evaluate a company that has personal issues that must be resolved. Read the following scenario to evaluate Taylor Inc. operations-management processes to help them maximize labor …
  4. business math

    Evaluate a company that has personal issues that must be resolved. Read the following scenario to evaluate Taylor Inc. operations-management processes to help them maximize labor productivity. Management for Taylor Inc. would also …
  5. business math

    Evaluate a company that has personal issues that must be resolved. Read the following scenario to evaluate Taylor Inc. operations-management processes to help them maximize labor productivity. Management for Taylor Inc. would also …
  6. business

    Evaluate a company that has personal issues that must be resolved. Read the following scenario to evaluate Taylor Inc. operations-management processes to help them maximize labor productivity. Management for Taylor Inc. would also …
  7. Operational Management

    Taylor Inc. manufactures widgets. There is a particular assembly line for Widget X. This assembly line includes the assembly of various raw materials, subassemblies, and packing of the finished widget. Currently, approximately 27% …
  8. Production and Operations management

    A ball bearing assembly firm wants to set up an assembly line which must have an output of 60 units per hour. The work elements are A to J and the task times are 40, 30, 50, 40, 6, 25, 15, 20, 18 and 30 seconds respectively. a. Determine …
  9. ISCOM

    Taylor Inc. manufactures widgets. There is a particular assembly line for Widget X. This assembly line includes the assembly of various raw materials, subassemblies, and packing of the finished widget. Currently, approximately 27% …
  10. algebra

    the acme widget company has $13,000 available for making widgets. part of the money is spent on an advanced widget-bending machine costing $1,000. the manufacturing cost for each widget is $3. how many widgets can be made with the …

More Similar Questions