Math olympiad

posted by Janice

A machine is set to give out one number less than twice the number fed into it. A number is fed into the machine. the result is fed back into the machine. The second result is 53. What number was first fed into the machine?

  1. drwls

    Do it backwards.
    The second number bed in was (53+1)/2 =27. The first was (27+1)/2 = 14

Respond to this Question

First Name

Your Answer

Similar Questions

  1. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  2. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  3. math- im really confused! please help!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  4. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  5. math

    a number machine takes any number put into it, multiplies it by 3 and then subtracts 2. reuben put a number into the machine. he took the new number that came out and put that number back into the machine. He took the new number that …
  6. help

    a number machine takes any number put into it, multiplies it by 3 and then subtracts 2. reuben put a number into the machine. he took the new number that came out and put that number back into the machine. He took the new number that …
  7. lotto next number 1/90

    What number will play next after this past winning and machine Win-18-88-62-69-27 machine-14-45-84-66-13 win-05-50-18-75-58 machine-71-43-12-68-35 Win-15-46-03-27-51 machine-70-07-76-43-08 Next -------------------- Answer this Question
  8. college finite math

    A product may be made using Machine I or Machine II. The manufacturer estimates that the monthly fixed costs of using Machine I are $17,000, whereas the monthly fixed costs of using Machine II are $14,000. The variable costs of manufacturing …
  9. Linear Programming

    We produce two products: product 1 and product 2 on two machines (machine 1 and machine 2). The number of hours of machine time and labor depends on the machine and the product as shown in Table 64. The cost of producing a unit of …
  10. math

    the number of bottles a machine is proportional to the number of minutes the machine operates the machine fills 250 bottles every 20 minutes 0,0 to 10,125 explain why these are the answers

More Similar Questions