Technology

posted by .

I'm really stuck on this question. i've posted it up a few times but no one ever helped

Using a set of automatic, programmable machines to produce a low-volume of a particular product is known as
a. primary processing
b. secondary processing
c. flexible manufacturing
d. just-in-time manufacturing

thank you and pleease help

  • Technology -

    Flexible manufacturing is a possible answer, and, the other answers are off-base to the question.

    But Flexible manufacturing is not particularily geared to low volume. It does that, but it can do high volume.

  • Technology -

    alright, i'll make sure with my text

    thank you

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. chemistry

    How do you calculate the % empty sapce in 100mL of air. Using Avogadro's number(6.02x10^23) and the average volume of O2 and N2(3.8x10^-24 cm3/molecule). I think you can use the ideal gas law but am not really sure how to do it. I …
  2. Science gr 8

    Hi I really need help !! What are the 3 problems fluid technology has helped solve?
  3. Technology

    i'm really not sure about this quesstion. can someone pleeease help me : 1. Using a set of automatic, programmable machines to produce a low-volume of a particular product is known as a. primary processing b. secondary processing c. …
  4. Technology

    A watchmaker would work with _____ measurements. a. standard b. precision c. indirect d. Swiss I'm a little confused on this question. I don't think it's A or D. I'm stuck between B and C, but I think it's C-indirect. Is there any …
  5. Technology

    Please help me on this question, I'm really stuck: 8. Aspirin are produced by using which of the following processing methods?
  6. MATH

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  7. MATH- please help!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  8. math- im really confused! please help!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  9. MATH-PLEASE HELPPP!!!!

    A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to produce one unit of each product is shown below. Product X:- Machine A: 1 Machine B: 2 Machine C: 2 Product …
  10. Math OPTIMIZATION

    A plastics firm has received an order from the city recreation department to manufacture 9,000 special Styrofoam kickboards for its summer swimming program. The firm owns 10 machines, each of which can produce 30 kickboards an hour. …

More Similar Questions