Math

posted by .

A landscaper is digging holes it takes him one hour to dig a hole 2 feet deep, 2 feet long and 2 feet wide. Assuming everything remains the same, how many hours would it take him to dig a hole 4 feet deep, 4 feet long and 4 feet wide?

Respond to this Question

First Name
School Subject
Your Answer

Similar Questions

  1. math..word problem

    A landscaper dug holes. It takes him 1 hour to dig a hole 2 feet deep, 2 feet long and 2 feet wide. Assuming everything remains the same, how many hours would it take him to dig a hole 4 feet deep, 4 feet long and 4 feet wide?
  2. Calculus

    A swimming pool is 40 feet long, 20 feet wide, 8 feet deep at the deep end, and 3 feet deep at the shallow end; the bottom is rectangular. If the pool is filled by pumping water into it at the rate of 40 cubic feet per minute, how …
  3. Math

    A swimming pool is 40 feet long, 20 feet wide, 8 feet deep at the deep end, and 3 feet deep at the shallow end; the bottom is rectangular. If the pool is filled by pumping water into it at the rate of 40 cubic feet per minute, how …
  4. math

    Kennys lawn is 30 feet wide and 30 feet long. It takes him 1 hour to mow the lawn. If kenny mows at the same rate, about how many hours would it take him to mow a lawn that was 30 feet and 95 feet long?
  5. English

    1. Dig a hold 2 feet deep. 2. Dig a hole for 2 feet deep. (Are both OK?
  6. Math

    A hole shaped like a rectangular prism is 3 feet wide, 5 feet long, and 3 feet deep. If the hole is made 2 feet deeper, how much will the volume of the hole increase?
  7. Maths

    If it takes 6 men 4h to dig a hole 6m deep,how long will it take 10 men to dig a hole 5m deep?
  8. Math (Ms.Sue)

      Sheri's freezer is 2 feet wide, 6 feet long, and 2 feet deep. What is the volume of her freezer?
  9. maths

    If it takes five men six hours to dig seven holes, how long does it take one man to dig half a hole?
  10. Math

    It takes 3 men to dig 2 identical trenches in 5 hours.If all the men work at same rate,how long will it take 5 men to dig 7 of these trenches?

More Similar Questions