Plan a systems development project for the Bead Bar, using the seven standard systems development life cycle phases

Plan a systems development project for the Bead Bar, using the seven standard systems development life cycle phases

Plan a systems development project for the Bead Bar, using the seven standard systems

development life cycle phases. Be sure to include the tasks required to implement your
project in each phase.
· Write a 1400-1750 word paper in APA format detailing your plan, and include any charts,
graphs, or other visual components that you feel would be helpful in illustrating your
project.
· Use the headings/sections provided in Appendix A to organize you

Plan a systems development project for the Bead Bar, using the seven standard systems development life cycle phases. Be sure to include the tasks required to implement your project in each phase.

Write a 1400-1750 word paper in APA format detailing your plan, and include any charts, graphs, or other visual components that you feel would be helpful in illustrating your project.

Bead Bar would be a consultant company needing An IT person to update their system. Describe the database function(s) type(s), and model(s), you recommend for the Bead Bar and your reasoning.

I. Introduction – outline the purpose of this Systems Development Project – why is it needed and what do you hope to accomplish with the recommended system – how will it help Bead Bar.

II. Outline the phases of the project, and what tasks would need to be accomplished in these phases – Use the 7 standard phases of the systems development life cycle that you listed in your Week 1 Checkpoint. Explain what each phase is and explain what tasks would need to be completed during this phase of the plan. Try to personalize it so that it fits Bead Bar's needs. If you were to outline this in Chapters, I would do it like this:

I. Intro

II. Project Schedule (Phases)

A. Planning

B. Systems Analysis

C. Systems Design

D. Development

E. Testing

F. Implementation

G. Maintenance

etc.,

III. Provide a list of input and output information you would use (i.e., what type of network, workstations, and devices you think should be included – you can go so far as to spec out individual components if you like,

2. Final Project: Bead Bar Systems Development Project

• Resources: Appendix A, Information Systems Technology
• Due Date: Day 7 [Individual] forum
• Plan a systems development project for the Bead Bar, using the seven standard systems development life cycle phases. Be sure to include the tasks required to implement your project in each phase.
• Write a 1400-1750 word paper in APA format detailing your plan, and include any charts, graphs, or other visual components that you feel would be helpful in illustrating your project.
• Use the headings/sections provided in Appendix A to organize your paper, as well as the specific requirements/topics to address in each section.
• Post your paper in your Individual forum.

To plan a systems development project for the Bead Bar, we will use the seven standard systems development life cycle (SDLC) phases. These phases will guide us through the process of analyzing the requirements, designing, developing, implementing, and maintaining the new system. Let's walk through each phase:

1. Planning Phase:
- Identify the purpose and objectives of the new system.
- Prepare a project charter that outlines the scope, goals, and stakeholders of the project.
- Create a project schedule with milestones and timelines.
- Assemble a project team and assign roles and responsibilities.

2. Requirements Gathering Phase:
- Engage with key stakeholders, including Bead Bar staff, managers, and customers, to understand their needs and expectations from the new system.
- Document the requirements, both functional (what the system should do) and non-functional (performance, security, etc.).
- Validate the requirements with the stakeholders to ensure their accuracy and feasibility.

3. Analysis Phase:
- Analyze the gathered requirements to identify any possible gaps, conflicts, or constraints.
- Perform a feasibility study to assess if the proposed system is technically and economically viable.
- Prepare a detailed system requirements specification document that outlines the functional and non-functional requirements.

4. Design Phase:
- Based on the requirements, design the system architecture, including hardware, software, and database components.
- Develop a detailed system design document that includes data models, process flows, user interfaces, and system interfaces.
- Create prototypes or mock-ups to receive feedback from stakeholders and make any necessary refinements.

5. Development Phase:
- Develop the system by writing code, configuring software, and integrating components.
- Conduct regular testing throughout the development process to identify and fix any defects.
- Collaborate closely with stakeholders to ensure the system is meeting their requirements.

6. Implementation Phase:
- Prepare a deployment plan to migrate the new system into a production environment.
- Train end-users on how to use the system effectively.
- Conduct a pilot implementation or beta testing to ensure smooth functioning and address any issues.
- Perform a full system implementation, including data migration and integration with existing systems.

7. Maintenance Phase:
- Establish a support system for ongoing maintenance, including bug fixes, upgrades, and enhancements.
- Monitor and measure system performance to identify any potential issues or areas for improvement.
- Regularly communicate with stakeholders to gather feedback and make necessary adjustments.

Remember, each organization and project may have specific requirements, so be sure to adapt these phases to fit Bead Bar's needs.