if it takes 10 men 6 months to build a house, how long will it take one man?

6months multiplied by 10 = 60 months

It’ll be 60 months I think, for one man it’s gonna take a lot longer

If it takes 10 men to build a house in 6 months how many would be needed to build it in 4 months

To find out how long it will take one man to build the house, we can divide the total time it took 10 men to build the house by the number of men.

Given that it took 10 men 6 months, the total man-months required to build the house is 10 * 6 = 60 man-months.

Since there is only one man doing the work, it will take him the same amount of man-months to complete the house.

Therefore, it will take one man 60 months to build the house.

clearly it will take ten times as long for a single man to do the job.