Input Process Output or IPO with Flowchart

Question: A reel of electric wire 150 metres long is cut into two pieces.One is 40 metres shorter than twice the length of the other.How long is each piece.

Please answer with flowchart.Thanks and god bless.

1. Please don't post the same question twice. Be patient and wait for a tutor with this expertise to come online and see it.

2. NEVER put personal information in a post, such as your email address. Posts with information like that will be removed.

no flowcharts here. So, the flow of logic is just

prompt for n1
read n1

since n1+n2=150, n2 = 150-n1
Also, n2 = 2*n1 - 40
You need to solve n1 + (2*n1-40) = 150
n1 = (150+40)/3
n2 = 150-n1

print n1 and n2 (with labels)

To solve the problem, you can use the Input-Process-Output (IPO) model. Here's how you can represent it using a flowchart:

Start:
- Ask the user to input the length of the reel (L).

Input:
- Read the length of the reel (L).

Process:
- Calculate the length of one piece as (2L - 40).
- Calculate the length of the other piece as (L - (2L - 40)).

Output:
- Display the length of the first piece.
- Display the length of the second piece.

End

Here's a flowchart representation of the processes described above:

______________
| |
| Start |
|______________|
|
|
|
V
______________
| |
| Input |
|______________|
|
|
|
V
_______________
| |
| Process |
|_______________|
|
|
|
V
______________
| |
| Output |
|______________|
|
|
|
V
______________
| |
| End |
|______________|

Note: Each rectangle represents a process, decision, or input/output operation, while the arrows indicate the flow of control through the flowchart.